04BBuildout · frontier site· cluster ledger reviewed 2026-10-14

Jamnagar AI campus AI datacenter

Reliance Industries · Jamnagar, Gujarat, India. The ledger records it as under construction, with 3 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
Reliance Industries
Location
Jamnagar, Gujarat, India
Status
Building
Current power
No public figure
Planned power
3 GWest — estimated / secondary-source figure
Accelerators
NVIDIA GB300 (initial fleet; >75K H100-eq for inference)
Announced
2024-08-29
First power
No public date

Reported 3 GW target — would be the world’s largest by capacity; $20–30B reported cost. Reliance itself says “multi-gigawatt”; construction had begun by Feb 2026 and the first 120 MW is due to be commissioned by end-2026.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.