Evidence reviewed 2026-10-22
AI lab compute estimates
11 labs tracked · 5 with comparable estimates · Latest benchmark: 2025-12-31.
This benchmark does not establish current whole-lab totals. Source published · Latest recorded disclosure . Review dates do not update historical estimates.
Compare historical estimates
Historical benchmark ·
H100-equivalents measure theoretical compute, not GPU counts. Bars show 90% uncertainty. Epoch’s method.
11 of 11 labs · 5 with estimates
Check two to four labs to compare scope and history. Selections stay when filters change.
- 1.74M
90% interval: 1.25M–2.19M
- 1.58M
90% interval: 1.01M–2.55M
- 1.19M
90% interval: 842k–1.72M
90% interval: 606k–1.64M
- 635k
90% interval: 587k–787k
No comparable estimate for this date
Unknown means unrecorded, not zero. Open a lab for its scope and evidence.
- No comparable estimate
- No comparable estimate
- No comparable estimate
- No comparable estimate
- No comparable estimate
- No comparable estimate
Ranges overlap substantially. Sorting by median does not establish a reliable ranking. Missing lab-years are unrecorded, not zero; no dates between observations are filled in. Current whole-lab totals are not established by this benchmark.
AI Compute Tracker (aicomputetracker.com), CC BY 4.0; includes data from Epoch AI (epoch.ai), CC BY 4.0. Source: Epoch AI’s frozen year-end dataset, published 2026-09-09. Downloads retain exact source precision, original dates and scope.
Compare selected labs
Select two to four labs above to compare estimates, scope and dated evidence side by side.
Historical estimates
Select labs above to see their recorded year-end estimates and uncertainty over time. Missing years stay empty.
All recorded observations and exact values remain available below.
Since the benchmark
Disclosures published after keep their original units and scope. A chip count, power figure or future agreement does not establish a comparable whole-lab total.
10 of 10 newer disclosures
Dates below are disclosure publication dates. Capacity dates remain in each description. The CSV follows these lab and status filters.
Prometheus first phase complete
Meta reported a completed first phase and hundreds of thousands of GPUs working across connected buildings at Prometheus. It did not publish an exact current GPU count or the lab's entire allocated fleet.
Disclosure published
Engineering at Meta source →Prometheus full-scale target: about 1 million GPUs
Meta described approximately one million GPUs as Prometheus's full-scale goal. The target must remain separate from the smaller first phase reported as complete.
Disclosure published
Engineering at Meta source →Agreement for Colossus 1 access
Anthropic agreed to use all Colossus 1 capacity, describing more than 300 MW and over 220,000 NVIDIA GPUs becoming accessible within May. The announcement is not a later confirmation of delivery or a whole-lab total.
Disclosure published
Anthropic source →- Colossus 1 →Cites the same source document ·
- Anthropic–Google TPU fleet →Cites the same source document ·
- Anthropic and Google →Cites the same source document ·
- Anthropic and SpaceX →Cites the same source document ·
Colossus 1 capacity offered to Anthropic
SpaceX announced an agreement giving Anthropic access to Colossus 1, a site with over 220,000 NVIDIA GPUs. SpaceX's owned infrastructure cannot therefore be assigned in full to its internal AI lab.
Disclosure published
SpaceX source →Abilene used for a frontier training run
OpenAI said GPT-5.5 was trained at Abilene on Oracle Cloud Infrastructure using NVIDIA GB200 systems. This confirms use of one site, without disclosing a whole-lab fleet total.
Disclosure published
OpenAI source →Stargate: more than 10 GW secured
OpenAI said it had exceeded its goal of securing 10 GW of US AI infrastructure. Secured projects include future buildout; this does not establish that 10 GW was operating.
Disclosure published
OpenAI source →Amazon agreement: up to 5 GW
The agreement covers up to 5 GW of capacity over time. Anthropic expected nearly 1 GW of additional Trainium2 and Trainium3 capacity by the end of 2026; that target is not an operating-capacity confirmation.
Disclosure published
Anthropic source →- Project Rainier →Cites the same source document ·
- Anthropic and Amazon Web Services →Cites the same source document ·
More than 1 million Trainium2 chips in use
Anthropic reported using over one million AWS Trainium2 chips for Claude training and serving. This is a chip count for one hardware family, not Anthropic's total compute or an H100 count.
Disclosure published
Anthropic source →- Project Rainier →Cites the same source document ·
- Anthropic and Amazon Web Services →Cites the same source document ·
Google and Broadcom expansion from 2027
Anthropic announced a multi-gigawatt TPU agreement with Google and Broadcom, with capacity expected to start arriving in 2027. It is future contracted capacity, not an addition to the historical estimate.
Disclosure published
Anthropic source →- Anthropic and Google →Cites the same source document ·
2025 available compute: about 1.9 GW
OpenAI reported roughly 1.9 GW of available compute in 2025. This power-capacity disclosure has its own scope; it is not a GPU count or an updated 2026 fleet total.
Disclosure published
OpenAI source →
AI Compute Tracker (aicomputetracker.com), CC BY 4.0.
Lab profiles and coverage
Profiles connect historical estimates with dated evidence. Unknown means no comparable estimate. Contract links match an exact recorded participant name or alias; they do not allocate a parent or provider’s whole fleet to a lab.
OpenAI1.74M H100-equivalents · 2025-12-31 historical estimate3 newer disclosures · latest 2026-04-29
Historical estimate · 90% uncertainty interval
1.25M–2.19M H100-equivalents.
What it includes
Research, model training and inference attributed to OpenAI. Mostly rented capacity. Epoch's scope excludes third-party Microsoft-hosted inference under its accounting treatment; this is not Microsoft's fleet.
Newer evidence
- Abilene used for a frontier training runReported operating · published
- Stargate: more than 10 GW securedPlanned capacity · published
- 2025 available compute: about 1.9 GWHistorical disclosure · published
Related infrastructure
Latest recorded contract
- OpenAI and SB Energy →Named buyer: OpenAI ·
Sources
Google DeepMind1.58M H100-equivalents · 2025-12-31 historical estimate
Historical estimate · 90% uncertainty interval
1.01M–2.55M H100-equivalents.
What it includes
DeepMind research and model inference within Alphabet. Allocation from Google's fleet is modeled. External cloud rentals and other business uses are excluded; the boundary remains uncertain.
Newer evidence
No disclosure published after 2025-12-31 is recorded for this lab in this review.
Latest recorded contract
- Google and Constellation Energy →Named buyer: Google ·
Sources
Anthropic1.19M H100-equivalents · 2025-12-31 historical estimate4 newer disclosures · latest 2026-05-06
Historical estimate · 90% uncertainty interval
842k–1.72M H100-equivalents.
What it includes
Claude research, training and inference, including partner-hosted inference paid for by Anthropic. Rented capacity across providers. A cloud provider's total fleet is not an Anthropic allocation.
Newer evidence
- Agreement for Colossus 1 accessContracted capacity · published
- Amazon agreement: up to 5 GWContracted capacity · published
- More than 1 million Trainium2 chips in useReported operating · published
- Google and Broadcom expansion from 2027Contracted capacity · published
Related infrastructure
- Project Rainier infrastructure record →
- Colossus 1 shared-capacity record →
- Anthropic–Google TPU capacity program →
Latest recorded contract
- Anthropic and Broadcom →Named buyer: Anthropic ·
Sources
Meta Superintelligence Labs996k H100-equivalents · 2025-12-31 historical estimate2 newer disclosures · latest 2026-10-19
Historical estimate · 90% uncertainty interval
606k–1.64M H100-equivalents.
What it includes
Frontier AI and basic AI research at Meta; the 2024 estimate covers predecessor teams. The lab's share of Meta's fleet is modeled. Recommendation and advertising systems are outside the estimate's intended scope.
Newer evidence
- Prometheus first phase completeReported operating · published
- Prometheus full-scale target: about 1 million GPUsPlanned capacity · published
Related infrastructure
Latest recorded contract
- Meta and BlackRock →Named buyer: Meta ·
Sources
SpaceXAI (xAI)635k H100-equivalents · 2025-12-31 historical estimate1 newer disclosure · latest 2026-05-06
Historical estimate · 90% uncertainty interval
587k–787k H100-equivalents.
What it includes
AI research, training and inference attributed to xAI, now SpaceXAI. The benchmark predates 2026 rentals to external customers. Later SpaceX-owned capacity is not automatically capacity available to its own lab.
Newer evidence
- Colossus 1 capacity offered to AnthropicContracted capacity · published
Related infrastructure
Latest recorded contract
- Google and SpaceX →Named provider: SpaceX ·
Sources
DeepSeekNo comparable estimate available for 2025-12-31
What it includes
Whole-lab research, training and inference capacity. No comparable whole-lab estimate is recorded in this reviewed benchmark. Unknown does not mean zero; a single training run or a parent company's fleet is a different scope.
Newer evidence
No disclosure published after 2025-12-31 is recorded for this lab in this review.
Alibaba (Qwen)No comparable estimate available for 2025-12-31
What it includes
Whole-lab research, training and inference capacity. No comparable whole-lab estimate is recorded in this reviewed benchmark. Unknown does not mean zero; a single training run or a parent company's fleet is a different scope.
Newer evidence
No disclosure published after 2025-12-31 is recorded for this lab in this review.
Zhipu AINo comparable estimate available for 2025-12-31
What it includes
Whole-lab research, training and inference capacity. No comparable whole-lab estimate is recorded in this reviewed benchmark. Unknown does not mean zero; a single training run or a parent company's fleet is a different scope.
Newer evidence
No disclosure published after 2025-12-31 is recorded for this lab in this review.
MiniMaxNo comparable estimate available for 2025-12-31
What it includes
Whole-lab research, training and inference capacity. No comparable whole-lab estimate is recorded in this reviewed benchmark. Unknown does not mean zero; a single training run or a parent company's fleet is a different scope.
Newer evidence
No disclosure published after 2025-12-31 is recorded for this lab in this review.
Moonshot AINo comparable estimate available for 2025-12-31
What it includes
Whole-lab research, training and inference capacity. No comparable whole-lab estimate is recorded in this reviewed benchmark. Unknown does not mean zero; a single training run or a parent company's fleet is a different scope.
Newer evidence
No disclosure published after 2025-12-31 is recorded for this lab in this review.
Mistral AINo comparable estimate available for 2025-12-31
What it includes
Whole-lab research, training and inference capacity. No comparable whole-lab estimate is recorded in this reviewed benchmark. Unknown does not mean zero; a single training run or a parent company's fleet is a different scope.
Newer evidence
No disclosure published after 2025-12-31 is recorded for this lab in this review.
Method, definitions and sources
What an H100-equivalent means here
Epoch normalizes a fleet's on-paper dense 8-bit performance (FP8 or INT8) to an NVIDIA H100. For chips without 8-bit support, it uses 16-bit performance. We reproduce that source-defined index; we do not convert it into the site's hardware FLOPS comparisons.
- The benchmark is historical. The observation date, publication date and our review date are different clocks; a later review does not turn a 2025 estimate into a 2026 total.
- H100e is not a physical GPU count, a uniform BF16 comparison, delivered training throughput, model capability, or a measure of utilization.
- Each point is Epoch's modeled median; its interval spans the 5th to 95th percentiles. Overlapping intervals do not support a confident ranking.
- Capacity used or rented by a lab differs from equipment owned by its parent or cloud providers. The scope includes research, training and inference, not just one training cluster.
- Missing estimates stay unknown. We do not interpolate between years, extrapolate to the present, sum percentile bounds, or add announcements with different units and scopes.
- Later disclosures are dated evidence in their original units. Contracted or planned capacity remains distinct from capacity reported operating; shared sites may overlap with cloud-provider totals.
All recorded estimates and exact values
Source precision is retained below and in CSV downloads. Decimal places describe the source model’s output, not certainty about hardware. No interpolation or extrapolation is applied.
| Lab / estimate date | Median | 5th percentile | 95th percentile |
|---|---|---|---|
| OpenAI | 1743439.8493869188 | 1251477.0828997404 | 2185142.3455992746 |
| Google DeepMind | 1583429.9538668268 | 1008220.4725750112 | 2548755.702786412 |
| Anthropic | 1189573.8857074357 | 842241.6260268212 | 1716534.7037994058 |
| Meta Superintelligence Labs | 996228.0602346028 | 606301.475799089 | 1637712.6527012342 |
| SpaceXAI (xAI) | 634792.6058833487 | 587268.4845382306 | 786632.5928349933 |
| Google DeepMind | 420334.47667409095 | 214143.6362592907 | 775030.4133149517 |
| OpenAI | 386218.7101238488 | 276938.3521681225 | 486056.6393925586 |
| Meta Superintelligence Labs | 247706.7361251794 | 123667.98345628983 | 480076.0743148279 |
| Anthropic | 208559.98299904328 | 145189.55328493097 | 298183.1495345837 |
| SpaceXAI (xAI) | 203366.31755523162 | 171066.07146658262 | 237382.2215257479 |
| OpenAI | 102534.71096180622 | 70131.45706056355 | 136201.42880654646 |
Source selection and reproducibility
The downloadable CSV is the numerical source of record for this page. Its SpaceXAI row differs from Epoch's introductory article; the two releases are not combined. The source contains no 2026 snapshot.
AI Compute Tracker (aicomputetracker.com), CC BY 4.0; includes data from Epoch AI (epoch.ai), CC BY 4.0. Figures reproduced from the source dataset; labels and presentation adapted. Upstream licence.
Source dataset SHA-256: a42673451e91a9896ed285ec74f66442473c07f9fedc89695a75ef3e4701169c
- AI chip users — year-end estimates CSVEpoch AI · 2026-09-09 · Research estimate / methodology
- Data on AI chip usersEpoch AI · 2026-09-09 · Research estimate / methodology
- AI chip users methodologyEpoch AI · 2026-09-09 · Research estimate / methodology
- A business that scales with the value of intelligenceOpenAI · 2026-01-18 · Company disclosure
- Building the compute infrastructure for the Intelligence AgeOpenAI · 2026-04-29 · Company disclosure
- Anthropic and Amazon expand collaboration for up to 5 gigawatts of new computeAnthropic · 2026-04-20 · Company disclosure
- Higher usage limits for Claude and a compute deal with SpaceXAnthropic · 2026-05-06 · Company disclosure
- Anthropic expands partnership with Google and Broadcom for multiple gigawatts of next-generation computeAnthropic · 2026-04-06 · Company disclosure
- Inside Prometheus: Meta's Journey to a Gigawatt-Scale SuperclusterEngineering at Meta · 2026-10-19 · Company disclosure
- New Compute Partnership with AnthropicSpaceX · 2026-05-06 · Company disclosure
Inspired by Binkg’s lab-compute comparison. Figures from that post are not used as observations here. Updates require a source review; this page is not a live fleet census.
Explore the infrastructure ledger and compute contracts for individual sites and announced capacity. Where chips arrived, country by country, is a separate estimate that is never added to these lab figures: AI compute by country.