Buildout · frontier site· cluster ledger evidence retained through 2026-10-25
Project Rainier AI datacenter
Anthropic · AWS · New Carlisle, Indiana. The ledger records it as operating, with 1 GW current and 2.2 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- Anthropic · AWS
- Location
- New Carlisle, Indiana
- Status
- Operating
- Current power
- 1 GWest — estimated / secondary-source figureIT load
- Planned power
- 2.2 GWCampus / facility power
- Accelerators
- ~1.05M Trainium2 live (tracker estimate); ~1 GW Trainium2+3 across AWS by end-2026
- Announced
- 2024-12-03
- First power
- 2025-10
- Target online
- 2028
Flagship of the Amazon–Anthropic expansion (up to 5 GW, >$100B AWS commitment over 10 years). Live figure is tracker IT load (Buildings 1–18 at the Oct 19, 2026 observation); planned figure is Amazon’s 2.2 GW campus, which the tracker models as ≈1.9 GW IT by Q1 2028.
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Delivery evidence and customer use
Selected contract tranches reviewed . An announced target stays a target until a source confirms delivery. These records do not change the campus capacity figures or form an operating-capacity total.
- · Project Rainier: operating use stated by AWS · Operating use stated by a party
Sources behind each figure
- Current power · est ≈910 MW IT live (tracker estimate) — Epoch AI data-center directory,
- Current power · est ≈1,037 MW IT live, Buildings 17–18 now operational, at the Oct 19, 2026 observation (tracker estimate) — Epoch AI data-center directory,
- Planned power Project Rainier in Northern Indiana—a 2.2-gigawatt data center campus — Amazon,
- Accelerators · est ≈1,045K Trainium2 installed (tracker estimate) — Epoch AI data-center directory,
- Accelerators Nearly half a million Trainium2 chips at activation, Oct 2025 — Amazon,
- Accelerators Nearly 1 GW of Trainium2+3 capacity online across AWS by end-2026; up to 5 GW total — Anthropic,
- Announced Project Rainier disclosed as an EC2 UltraCluster built with Anthropic, Dec 3, 2024 — Amazon (AWS press release),
- First power AWS activates Project Rainier, now fully operational, Oct 2025 — Amazon,
- Target online · est In Q1 2028, projected to rise to 1,925 MW IT power (Buildings 19–32 operational; tracker estimate) — Epoch AI data-center directory,
Connected labs, contracts and evidence
Each link names its recorded relationship. Sharing a source does not establish that a contract funds this site; a lab reference does not assign the site’s whole capacity to that lab.
- Anthropic →Listed in this lab’s infrastructure references
- Anthropic and Amazon Web Services →Cites the same source document ·
- Anthropic and Amazon Web Services →Cites the same source document ·
- More than 1 million Trainium2 chips in use →Cites the same source document ·
- Amazon agreement: up to 5 GW →Cites the same source document ·
Background reading: Project Rainier on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.