04BBuildout · multi-site program· cluster ledger reviewed 2026-10-14

Anthropic–Google TPU fleet AI compute program

Anthropic · Google Cloud · Multiple US sites. The ledger records it as under construction, with 6 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
Anthropic · Google Cloud
Location
Multiple US sites
Status
Building
Current power
No public figure
Planned power
6 GW
Accelerators
Up to 1M TPUs (v7 Ironwood era); next-gen TPUs via Broadcom from 2027
Announced
2025-10-23
First power
No public date

Capacity program, not a single campus: >1 GW in 2026 plus 5 GW of next-gen TPU capacity (Google/Broadcom) from 2027. Anthropic calls that deal an expansion of its $50B US commitment, so it may overlap the Fluidstack rows, which carry no MW.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Planned power >1 GW of TPU capacity online in 2026 (expansion worth tens of billions) — Anthropic,
  • Planned power 5 GW of next-generation TPU capacity with Google and Broadcom, coming online from 2027 — Anthropic,
  • Accelerators Up to 1M Google TPUs under the Oct 2025 agreement — Anthropic,
  • Announced Google Cloud TPU expansion announced Oct 23, 2025 — Anthropic,