Buildout · frontier site· cluster ledger evidence retained through 2026-10-25
Fluidstack build (New York) AI datacenter
Anthropic · Fluidstack · New York. The ledger records it as under construction, with no public capacity figure. Every figure below traces to a dated public source.
Ledger figures
- Operator
- Anthropic · Fluidstack
- Location
- New York
- Status
- Under construction
- Current power
- No public figure
- Planned power
- No public figure
- Accelerators
- Custom Anthropic build (chips undisclosed)
- Announced
- 2025-11-12
- First power
- No public date
- Target online
- 2026
Part of Anthropic’s $50B US datacenter program with Fluidstack (Texas, New York and more sites to come); no per-site MW published.
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Announced $50B US datacenter investment with Fluidstack; Texas and New York first, online through 2026 — Anthropic,
- Accelerators Custom-built facilities; Fluidstack picked for its ability to deliver “gigawatts of power” (chips undisclosed) — Anthropic,
- Target online $50B US datacenter investment with Fluidstack; Texas and New York first, online through 2026 — Anthropic,
Connected labs, contracts and evidence
Each link names its recorded relationship. Sharing a source does not establish that a contract funds this site; a lab reference does not assign the site’s whole capacity to that lab.
- Anthropic and Fluidstack →Cites the same source document ·
Background reading: FluidStack on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.