Open record· latest 2026-10-25

Corrections

Every material error we have corrected in the site’s own numbers and claims, newest first: what the site said, what the correction changed it to, where it appeared, and the evidence. Each entry is dated history; a figure corrected again later links the newer entry. Routine price moves are not corrections; quotes keep their own observation dates.

Spotted an error? Email aicomputetracker@gmail.com, or use “Report a wrong price” in the evidence details of any quote row. Every correction is also listed in the desk log, and its RSS feed carries the newest 10. The release named with each entry is a pull request in the site’s private repository; ask if you need its details.

Token prices#

Grok estimates omitted documented batch and long-context cache rates

The site said
Grok 4.7, 4.6 and 4.5 had no recorded batch rates, and no Grok row had a combined batch cache-hit rate or long-context discounts. The estimator used its disclosed full-rate fallback for missing rates and said batch and caching were not stacked. The earlier reproduced Grok 4.7 workload of 100 million input tokens, no output, 100% batch and 100% cache therefore estimated $200.
Corrected to
A scoped reading of xAI's pricing page recorded the stated 20% batch discount for Grok 4.7, 4.6, 4.5 and 4.3, including cached tokens and long context. The estimator used only these explicit combined and tier-specific rates, giving $40 for that short-context Grok 4.7 workload. Grok Build 0.1 remained outside the batch discount list. All other models kept their observations and missing-discount fallbacks.
Where
/tools/ API estimator; /ai-model-api-prices/ and Grok model details; /watchlist/ API estimates; /token-prices.json and /token-prices.csv.
Found by
A review of published pages and data.
Release
Explicit Grok batch and cache rates

Token prices#

API estimates applied cache discounts to unsupported batch traffic

The site said
For Grok 4.7, 100 million monthly input tokens, zero output, 100% batch and 100% cache produced a $50 estimate despite the stated standard-rate fallback implying $200. The estimator also ranked workloads beyond recorded model context limits.
Corrected to
Requested batch traffic retained its allocation when no batch rate was recorded and used the standard rate without an overlapping cache discount. The reproduced Grok workload estimated $200. Models exceeding their recorded context limit were excluded from priced rankings, while unknown limits remained explicitly unknown.
Where
/tools/ API bill estimator; /ai-model-api-prices/ workload estimates.
Found by
A review of published pages and data.
Release
Buyer workflow and data consistency improvements
GPU quotes#

Hardware and rental FAQs selected older quotes than the current comparison

The site said
Hardware and the rental comparison used different quote selectors, producing inconsistent MI300X and MI355X headlines. Some cheapest-provider FAQ answers also selected the older reviewed snapshot without identifying the differing price selection. The separate retired-provider correction records why the comparison’s then-selected Vultr offers were ineligible.
Corrected to
Hardware rental economics, rental summaries, specification strips, cheapest-provider FAQs and their structured data were aligned to the comparison’s current eligible offer selection and original dates. Historical survey statements retained explicit dates. No provider observation or immutable price history was rewritten.
Where
/hardware/ rental economics; /gpu-rental-prices/ detail summaries, FAQs and structured data.
Found by
A review of published pages and data.
Release
Buyer workflow and data consistency improvements
Financials#

A headline capex multiple compared guidance with actuals on different accounting bases

The site said
The Infrastructure financial summary presented combined 2026 guidance as approximately 1.8 times 2025 actuals. Amazon's retained guidance was net cash capex while its historical figures were gross purchases, and Microsoft's retained guidance included a lease reclassification. Detailed notes described the differences, but the headline multiple did not qualify its comparison.
Corrected to
The headline multiple was removed. Individual company guidance retained its recorded ranges or point estimates, reporting periods, source dates and accounting bases beside the figures. Historical values were preserved, with basis changes disclosed rather than interpreted as like-for-like spending growth. No financial observation or dataset review date was changed.
Where
/buildout financial summary, guidance comparison and chart explanations.
Found by
A review of published pages and data.
Release
Infrastructure comparison workspace
Token prices#

An unsupported date was given for Claude Sonnet 5's standard price

The site said
The token-price table said Claude Sonnet 5's introductory $2 and $10 per million input and output tokens were made its standard price on Aug 10, 2026. Anthropic's pricing page states the change but no date for it.
Corrected to
The date was removed. The row kept the $2 and $10 standard price and the note that the rise to $3 and $15 planned for Sep 1, 2026 would not occur, both of which Anthropic's pricing page states.
Where
/ai-model-api-prices/ table and Claude Sonnet 5 model page; /token-prices.json and /token-prices.csv; llms-full.txt token prices.
Found by
A review of published pages and data.
Release
PR #201 — AI model API prices page v2
GPU quotes#

Custom GPU comparisons did not follow the rental index’s current price selection

The site said
The custom comparison page derived rental prices only from the reviewed quote snapshot while the main GPU index and Watchlist could select newer eligible daily observations. A selected accelerator could therefore show a different reference price, coverage and observation date without identifying the differing data selection.
Corrected to
The custom comparison’s reference, specialist and big-cloud prices were prepared from the GPU index’s exact current profiles, including their latest eligible provider observations, mixed daily and reviewed source dates, retained older prices and comparable historical changes. Deferred history was verified against every selected full profile before plotting. Reviewed marketplace quotes remained separate. No recorded source price, observation date or specification review date was rewritten.
Where
/compare/ current rental prices, source dates and inline history; /chart-data/compare.json prepared comparison catalog.
Found by
A review of published pages and data.
Release
Accelerator comparison workspace
Token prices#

Gemini 3.6 Flash's scheduled price rise was missing from the token-price table

The site said
The token-price table, reviewed on Oct 11, 2026, listed Gemini 3.6 Flash at $0.75 per million input tokens and $3.75 per million output tokens with no note, although Google's pricing page scheduled the same change for it as for Gemini 3.8 Flash.
Corrected to
The row was given Google's stated terms: $0.75 and $3.75 through Dec 31, 2026, then $1.50 and $7.50 from Jan 1, 2027, in its Terms and in the payloads' temporary-price fields.
Where
/ai-model-api-prices/ table and Gemini 3.6 Flash model page; /token-prices.json and /token-prices.csv; llms-full.txt token prices.
Found by
A review of published pages and data.
Release
PR #201 — AI model API prices page v2
Hardware specs#

Two launch months and three purchase-price estimates lacked support

The site said
The B300's first availability read Jul 2025, the month the first GB300 NVL72 rack shipped, and the MI325X's read Dec 2024, when AMD had only said it would ship. The V100, A100 and MI300X purchase-price estimates ($13,000, $12,000 and $15,000) rested on no reputable report, and the Gaudi 3 row carried no estimate flag although its launch month is unconfirmed.
Corrected to
The B300 moved to Sep 2025, when Supermicro began volume shipments of HGX B300 systems, and the MI325X to Feb 2025, when Vultr became the first cloud to offer it; both stayed estimates. The V100 and MI300X estimates were removed, the A100's became the roughly $10,000 CNBC reported in February 2023, and the Gaudi 3 row was flagged as an estimate.
Where
/hardware spec table; llms-full.txt accelerator specs; /accelerators.json and /accelerators.csv (launch, est).
Found by
A review of published pages and data.
Release
PR #206
Token prices#

Homepage API savings were stated as general discounts instead of model-specific terms

The site said
The homepage displayed roughly 50% batch and 90% cached-input discounts and said production pays below list. Those constants did not represent every model’s recorded terms or establish realized customer bills.
Corrected to
The general savings claim was removed. The homepage showed current model examples with separate input and output list prices, review dates, and each model’s recorded cache, batch and context terms. Missing prices remained explicitly unrecorded; no provider price was changed.
Where
/ homepage API price preview.
Found by
A review of published pages and data.
Release
Homepage comparison redesign
GPU quotes#

Homepage rental headlines used an older price selection than the comparison

The site said
The homepage hero selected rental headlines from the reviewed quote snapshot while its rental teaser and the core comparison could select newer daily observations. On October 24 the H100 floor carried an October 14 observation in the hero and an October 23 observation in the teaser.
Corrected to
The duplicated reviewed headline figures were replaced with a comparison entry point. Homepage offer cards were prepared from the core comparison’s exact current offers, including original dates, freshness, provider coverage and recorded instance terms. No source observation or historical price was rewritten.
Where
/ homepage rental headlines and offer cards.
Found by
A review of published pages and data.
Release
Homepage comparison redesign
Buildout#

HUMAIN’s Kingdom-wide capacity target was classified as one campus

The site said
The HUMAIN AI factories row lacked a multi-site marker, so its up-to-500 MW target was classified as one Riyadh campus. Its retained NVIDIA claim and ledger note described a program across factories in Saudi Arabia.
Corrected to
The row was explicitly classified as a multi-site program. Campus counts and single-campus rankings excluded it, while the program comparison retained its up-to-500 MW target, original claims, dates and stable identifier. No capacity figure, milestone, source publication date or dataset review date was changed.
Where
/buildout campus counts, entry-type filters and comparisons; /buildout/humain-riyadh/ and buildout ledger exports.
Found by
A review of published pages and data.
Release
Infrastructure comparison workspace
GPU quotes#

Retired Vultr plans returned as the MI300X and MI355X typical prices

The site said
Current rental prices accepted a provider missing from the reviewed quotes when its daily observation was timed after the review. The Oct 14, 2026 review that retired Vultr's non-deployable plans carries a date without a time, so Vultr's observations from 09:38 that day counted as newer. Its $3.99 MI300X and $2.59 MI355X plans became the only providers behind those chips' typical prices, on the watchlist, the chip pages and the GPU rental overview.
Corrected to
A review recorded as a bare date was treated as covering its whole day, so a provider absent from it needed a collection on a later day to count as current. The Vultr plans left the current prices, and MI300X and MI355X used their remaining reviewed provider quotes. Exactly timed reviews kept the exact comparison.
Where
MI300X and MI355X typical prices on /gpu-rental-prices and the chip pages; /watchlist GPU rows.
Found by
A review of published pages and data.
Release
Retired providers stay out of current rental prices
GPU quotes#

Watchlist reference prices did not follow the main rental index’s current data selection

The site said
The Watchlist prepared GPU reference prices from the reviewed quote snapshot while the main GPU index could select newer eligible daily observations. The same GPU could therefore show a different reference price and date without identifying the differing source selection. API price review dates also appeared under a generic Observed label.
Corrected to
Watchlist reference prices, coverage, observation dates and comparable changes were prepared from the main rental index’s exact selected profile. Eligible daily collections and dated reviewed fallbacks were distinguished. API review dates were labeled Reviewed. No source observation, recorded price, review date or historical billing condition was rewritten.
Where
/watchlist reference prices, source labels and evidence dates; /chart-data/watchlist.json prepared public catalog.
Found by
A review of published pages and data.
Release
Watchlist price workspace

Hardware specs#

Full-power electricity estimates were described as guaranteed cost floors

The site said
The Hardware page labeled chip TDP multiplied by assumed facility overhead and a tracked state's industrial electricity rate as a lower bound on rental cost, displaying a greater-than-or-equal sign. Its explanation assumed full-TDP draw for the rented hour, although actual chip power depends on the workload.
Corrected to
The calculation was relabeled as an approximate electricity-cost scenario at full published chip power, with ordinary rounding and no bound inequality. The explanation retained the stated power, facility-overhead and electricity-rate inputs and their data date, and identified workload dependence and omitted host-server power and capital costs. It made no claim to measured consumption or a guaranteed minimum rental cost.
Where
/hardware electricity-cost scenario and explanatory research.
Found by
A review of published pages and data.
Release
PR #190 — hardware comparison workspace
GPU quotes#

Older provider-history rows inherited later configuration descriptions

The site said
Provider history grouped observations by GPU, provider, SKU, region and billing basis without including the configuration description. A later description replaced the metadata for the whole series. Nebius H100, H200, B200 and B300 observations dated October 11 and 14, 2026 consequently carried their October 20 descriptions instead of their original recorded descriptions.
Corrected to
The immutable observations were re-exported with separate configuration identities, preserving each observation's recorded description. The metadata repair did not change its recorded price or observation date. New observations include a configuration fingerprint in their comparison identity, and current-quote fallbacks match the actual configuration and evidence before reusing a historical point. Lambda instance resources and Hyperstack's explicitly labeled maximum resource limits were retained in the new collector's configurations.
Where
/price-history.json and /price-history.csv provider series; Per-GPU history payloads and provider-history charts.
Found by
A review of published pages and data.
Release
PR #177 — all-GPU rental overview and configuration-aware history

Hardware specs#

Three DDR5 spot prices relayed from DRAMeXchange were published although its terms bar using them without consent

The site said
The /hardware memory cost chart plotted three DDR5 spot prices per gigabyte, $3.42 for Sep 2025, $12.42 for Nov 2025 and $13.60 for Dec 2025, converted from 16Gb chip spot prices that Resell Calendar relayed from DRAMeXchange, although DRAMeXchange's terms bar using its prices without its consent.
Corrected to
The three DDR5 points were removed, and with them the chart's DDR5 series; the chart kept its four HBM3e contract-price estimates from Silicon Analysts.
Where
/hardware memory cost chart, its table view and CSV; /chart-data/tables/hardware-memory-cost.json.
Found by
A review of published pages and data.
Release
PR #159
GPU quotes#

Prices from five GPU clouds whose terms bar reuse, and three aggregator estimates, were published

The site said
The site published 22 hand-surveyed list prices from CoreWeave (6), Crusoe (5), RunPod (8), Salad (2) and Voltage Park (1), the price ledger's earlier observations of all five and 59 archived CoreWeave and Crusoe list prices, although each provider's own terms bar that use: CoreWeave's Terms of Use (July 8, 2024) bar displaying site content in connection with products or services that are not CoreWeave's; Crusoe's Website Terms of Use (version 1.0, Aug 12, 2024) bar copying, reproducing, publishing or displaying its content without written permission; Salad's Terms of Service (Sep 29, 2026) bar using or displaying any element of the site without written consent; RunPod's Terms of Service (Mar 24, 2026) bar systematic retrieval to compile a collection or database; Voltage Park's Terms of Service (Feb 5, 2025) bar collecting data from its platform by any automatic or manual process without written permission. The quote tables also listed three secondary estimates observed on Jul 6, 2026 beside providers' own prices, two of them under a provider's name: the RunPod MI300X price of $1.99 and the TensorWave MI355X price of $2.95 were GetDeploying's figures, and the V100 market average of $0.99 was AIMultiple's; the ledger kept 13 GetDeploying-sourced estimates in all. The quarterly price-history charts drew a typical-price line of midpoints compiled from specialist list prices that included CoreWeave's, Crusoe's and RunPod's, and the homepage H100 insight read a 2023–25 price collapse from it.
Corrected to
Every value from the seven sources was taken off the site's pages, payloads and downloads: the 25 rows, 67 price-ledger observations and the 38 class-aggregate points they could have fed, the 59 archived list prices, their venues in the archived quote snapshots, and the quarterly typical-price line with the figures read from it (its flat-quarter streak and level, the H100, H200 and B200 calendar y/y changes, the H100 collapse years and the B200 “+20% y/y” annotation); the quarterly charts kept the big-cloud list price. The H100 cheapest on-demand price became Hyperstack's $3.20, and the /hardware price per PFLOP-hour ranking was led by B200 instead of H100. The L40S cheapest on-demand price and typical price became Nebius's $1.55, a single venue's “from” price for its smallest preset, and A100 80GB's typical price, left with two specialist venues, became their $1.35–$2.79 range. GB200 NVL72 and MI300X lost their specialist quotes, so their cheapest on-demand prices became Oracle OCI's $16.00 and $6.00 and both left the price per PFLOP-hour ranking, as did RTX 4090 and RTX 5090, which lost every on-demand and marketplace quote and were given Beam's serverless per-second rates ($0.6912 and $1.0908 per GPU-hour, GPU only). The MI300X and MI355X all-market ranges lost their estimated low ends, which left MI355X with Oracle OCI's $8.60 alone, and V100 kept the three providers' own prices it already headlined. ACT.GB200-NVL72, ACT.RTX-4090 and ACT.RTX-5090 .SPEC-MED@primary-on-demand-v1 and ACT.RTX-4090 and ACT.RTX-5090 .MKT-FLOOR@marketplace-access-v1 were marked withdrawn, never to be reused; of the .SPEC-MED series of B300, B200, H200, H100, A100 80GB, MI300X and L40S, which stayed citable, those of H200, A100 80GB and L40S kept no ledger point at the withdrawal, only the current quote table's typical price; the re-survey's observations of Oct 20, 2026 gave H200's and L40S's a point that day (H200 from Nebius's $5.40 and Together AI's $5.99, L40S from Nebius's $1.55 alone) and A100 80GB's none. The CoreWeave, Crusoe and RunPod provider pages were redirected to the provider matrix, the RTX 4090 and RTX 5090 class-band embeds, badges and class-band chart tables kept their addresses with the withdrawal's notice instead of data (their price-history embeds kept theirs, drawing each chip's serverless prices from Oct 20, 2026), three desk-log entries computed from those prices became withdrawal notices under the same permalinks, B200's typical-price venue change of Oct 11, 2026 kept its permalink with its like-for-like move recomputed without CoreWeave's and RunPod's prices (+16.9% became +7.5%), and the closed evidence-digest day of Oct 11, 2026 got a new root without three of their digests. Earlier corrections records keep the figures they quote.
Where
H100, H200, B200, B300, GB200 NVL72, A100 80GB, MI300X, MI355X, L40S, RTX 4090, RTX 5090 and V100 quote tables, ranges, chip-page titles and withdrawal notices on /gpu-cloud and the chip pages; the TPU v5p chip page's price history and withdrawal notice; the chip pages' social cards (og:image); /gpu-cloud/providers/ matrix and its other billing models; the CoreWeave, Crusoe and RunPod provider pages, redirected to the matrix and out of the sitemap; each other provider page's rank of its prices among its chip's quotes; /hardware price per PFLOP-hour ranking and the accelerator table's rental prices; /gpu-cloud/archived-prices/ and the chip pages' archived-price notes; homepage H100 quarterly chart, brief, lede and insight; the Board tiles of B300, B200, GB200 NVL72, H200, H100, A100 80GB, MI300X, L40S, RTX 5090 and RTX 4090, the market tape, and the GPU-cloud section's provider count and H100 price; the A100 80GB, H200 and B200 quarterly histories; /compare/ reference prices of a100-80gb-vs-h100, b200-vs-b300, h100-vs-b200, h100-vs-h200, h200-vs-b200 and l40s-vs-a100-80gb; /compare/h100-vs-mi300x/ and /compare/rtx-4090-vs-rtx-5090/ (noindex, out of the sitemap); /tools quote check; the H100, H200, B200, B300, GB200 NVL72, A100 80GB, MI300X and L40S badges, the badge gallery (/data/badges/) and the site badge's provider count; RTX 4090 and RTX 5090 class-band and price-history embeds, badges and class-band chart tables; GB200 NVL72 and MI300X class-band embeds, the GB200 NVL72 price-history embed and the embed gallery (/data/embeds/); the Board's citations (/chart-data/reference-citations.json); the core-review status on every page, whose manual GPU quotes kept inputs from Jul 6, 2026; four entries on /log and /log/2026-10/, /feed.xml and the H200, RTX 4090, RTX 5090 and B200 chip feeds; /price-history.json, the chip shards and /price-history.csv; /archive/quotes/ dated permalinks, the /archive/ index's aggregate counts and the class-band charts; /quotes.json, /quotes.csv, /reference-prices.json and /status.json; llms-full.txt quote rows and citable series; /evidence, /evidence/refs.csv, /evidence/digests.json and /evidence/digests/; the licence and attribution lines of the payloads, /data and /openapi.json, which no longer credit RunPod or Voltage Park; /terms third-party notices and /about.
Found by
A review of published pages and data.
Release
PR #159
GPU quotes#

Vast.ai marketplace prices were published although Vast's terms bar their use in price comparisons

The site said
The site published Vast.ai marketplace asks that its scripts collected: six automated quote rows (H100, H200, B200, B300, RTX 4090 and RTX 5090), the price ledger's 4-hourly Vast.ai observations and the daily marketplace-access floors built from them, the hourly marketplace tape, and quarterly marketplace floors compiled from archived marketplace observations. Vast.ai's Terms of Use (version 2026-09-01) bar automated retrieval (Prohibited Activities 7), use in an index, benchmark or pricing-comparison service (10(ii)), redistribution (10(iii)) and scripts (18).
Corrected to
Every Vast.ai value was taken off the site's tables, charts, archives, payloads, feeds and downloads, and its collectors stopped. The marketplace-access floors of B300, B200 and H200 ended with their Vast.ai points, and A100 80GB's with its quarterly line, so ACT.B300, ACT.B200, ACT.H200 and ACT.A100-80GB .MKT-FLOOR@marketplace-access-v1 were marked withdrawn, never to be reused; H100's floor kept only SF Compute's $2.04 of Jul 6, 2026, which /quotes.json then served as its latest point and which the archived quote snapshots of Jul 23, Oct 11 and Oct 13, 2026 and the H100 class-band chart then read as its marketplace floor, and the RTX 4090 and RTX 5090 floors kept none of their ledger points and were left to Salad's current rows. Archived quote snapshots were served without the Vast.ai rows, the seven desk-log entries computed from them became withdrawal notices under the same permalinks, and every evidence-digest day got a new root without the Vast.ai digests, closed days included, or left the manifest if it held only them. The quarterly marketplace floors were removed and the tape emptied. Earlier corrections records keep the Vast.ai figures they quote; the ledger shards they cite no longer show those points.
Where
H100, H200, B200, B300, RTX 4090 and RTX 5090 quote tables, marketplace-access floors and spot board on /gpu-cloud and the chip pages; the marketplace tape on /gpu-cloud, /marketplace-tape.json and its llms.txt entry; homepage lede, brief, Board tiles and venue-spread tile; /gpu-cloud/providers other billing models; /compare/ marketplace rows: h100-vs-h200, rtx-4090-vs-rtx-5090, a100-80gb-vs-h100, b200-vs-b300, h100-vs-b200, h100-vs-mi300x and h200-vs-b200; seven entries on /log and /log/2026-10/, /feed.xml and the chip feeds; /price-history.json, the chip shards and /price-history.csv; /archive/quotes/ dated permalinks, the /archive/ index's aggregate counts and the class-band charts; chart embeds and their data tables; the RTX 4090 and RTX 5090 social cards' quote-evidence dates (og:image); homepage H100 quarterly chart and the A100 80GB, H200 and B200 quarterly charts; /quotes.json, /quotes.csv and /reference-prices.json; llms-full.txt quote rows and citable series; /evidence, /evidence/digests.json, /evidence/digests/ and /evidence/refs.csv; /status.json quote counts, automated observations and citable-series count; the site badge's provider count (/badge/site.svg); /terms third-party notices and /about.
Found by
A review of published pages and data.
Release
PR #153

Hardware specs#

The memory-cost insight rested on a B300 price no reputable source gives

The site said
The /hardware memory-cost insight put the B300's 270 GB of HBM3e at roughly $4,200, about 9% of a ~$45,000 street price; no reputable source gives a per-unit B300 price, and NVIDIA publishes none.
Corrected to
The B300 was left without a street price, as were the H200 and MI325X, for which no reputable per-unit price was found either. The insight moved to the B200, whose ~$35,000 estimate is the midpoint of the $30,000 to $40,000 range NVIDIA's CEO gave CNBC: its 180 GB of HBM3e came to roughly $2,800, about 8% of that price.
Where
/hardware memory-cost insight.
Found by
A scheduled survey.
Release
PR #136
Forward curves#

Forward curves read thin Kalshi ladders as price levels, and archived sessions were called unchangeable

The site said
The forward curves and their archive priced every strike from its bid/ask midpoint or last trade, repaired each ladder with a running minimum and smoothed the back months, so thin books published as levels. The Oct 12, 2026 session showed B200 Jan ’27 at $6.98, quality-passed, though its bids and asks bounded it only at $5.67 or more. /archive said an archived session’s values never change.
Corrected to
The 13 archived sessions from Jul 23 to Oct 14, 2026 whose raw Kalshi ladders were retained were re-derived from those ladders under estimator v2: each point carries its bid/ask bracket, only identified points draw a line or feed a move, and an unidentified point is shown as its bracket, never as a price. Oct 12’s B200 Jan ’27 became an unidentified point whose bids put it at $5.67 or more. Each re-derived permalink was changed to keep the values first published (rederived.superseded), and /archive to say a closed session changes only through a recorded re-derivation.
Where
/archive/curves/{date}.json permalinks for Jul 23–Oct 14, 2026; curve time machine; /archive; /log; homepage forward curves, terminal and chip pages.
Found by
A review of published pages and data.
Release
PR #126
Hardware specs#

GB200 NVL72 was priced per PFLOP-hour at the HGX B200's dense rate

The site said
The price per PFLOP-hour ranking divided GB200 NVL72's cheapest specialist on-demand price by the HGX B200's 2,250 TF dense BF16, so CoreWeave's $10.50 per GPU-hour read as $4.67 per PFLOP-hour.
Corrected to
GB200 NVL72 got a spec row of its own from the GB200 NVL72 column of NVIDIA's Blackwell datasheet, 2,500 TF dense BF16 per GPU (its 5 PF sparse figure, halved as the datasheet's footnote directs), so the same $10.50 per GPU-hour read as $4.20 per PFLOP-hour.
Where
/hardware price per PFLOP-hour ranking.
Found by
A review of published pages and data.
Release
PR #119
GPU quotes#

The quarterly big-cloud floors misread several archived list prices

The site said
The quarterly price-history charts put the H100's big-cloud floor at $12.29 per GPU-hour from 2024Q2 to 2025Q1 and $6.88 in 2025Q2, the A100 80GB's at $4.10 in 2021Q1 and 2021Q3 and $2.74 from 2025Q3 (the A100 40GB's price), and the H200's at $10.71 in 2024Q4 and 2025Q1 and $7.91 in 2025Q2.
Corrected to
Read from archived price lists: the H100's floor was Google Cloud's $11.06 from 2024Q2 to 2025Q2, since AWS cut its price only in June 2025; the A100 80GB's was AWS's $3.43 from 2025Q3, with no archived price before Azure's record of December 2021; and the H200's was $10.60 in 2025Q1 and 2025Q2, with no archived price in 2024Q4.
Where
H100, A100 80GB and H200 chip pages: quarterly price history; homepage H100 price history.
Found by
A review of published pages and data.
Release
PR #138
Buildout#

The OpenAI-Cerebras deal carried Reuters' $10 billion instead of the value Cerebras states

The site said
The compute deals ledger listed OpenAI's January 2026 deal with Cerebras at more than $10 billion, a press-reported figure Reuters attributed to a source.
Corrected to
More than $20 billion, the value Cerebras gave the deal in its IPO prospectus (Form S-1/A, May 4, 2026), listed as a contract value stated by a party to the deal.
Where
/deals ledger table; /deals.json.
Found by
A review of published pages and data.
Release
PR #139
Buildout#

The $300 billion OpenAI-Oracle deal was listed as unconfirmed by either company

The site said
The compute deals ledger listed the September 2025 OpenAI-Oracle contract at about $300 billion as a press report that neither company had confirmed, with a press-reported value.
Corrected to
More than $300 billion over five years, the value OpenAI gave its July 2025 Oracle partnership on September 23, 2025, listed as a contract value stated by a party to the deal; Oracle had not stated the figure, and neither company had confirmed the reported 2027 start.
Where
/deals ledger table; /deals.json.
Found by
A review of published pages and data.
Release
PR #140
Financials#

Oracle's FY27 capex guidance has an Oracle source

The site said
/buildout cited a secondary press report for Oracle's ~$70B FY27 net cash capex guidance, marked it a secondary source, and said no Oracle release, slide deck or transcript stated the figure.
Corrected to
The guidance row cited Oracle's own Q4 FY26 earnings slides (June 10, 2026, slide 15), which state ~$70B of FY27 net cash outlay for capex, and was no longer marked secondary; the note said the ~$90–95B gross range rests on secondary reports of the June 10 call. The $70B figure did not change.
Where
/buildout capex source notes (Oracle); /financials.json Oracle guidance row.
Found by
A review of published pages and data.
Release
PR #133
Hardware specs#

The GeForce RTX 4090 was listed as shipping after it left production

The site said
The spec table listed the GeForce RTX 4090 as shipping.
Corrected to
Legacy: press reports relaying supply-chain sources said the card went out of production in late 2024, and the RTX 5090 succeeded it in January 2025. NVIDIA has published no end-of-life notice.
Where
/hardware spec table; /accelerators.json and /accelerators.csv.
Found by
A scheduled survey.
Release
PR #136
Hardware specs#

Vera Rubin's first production shipments were dated a month late

The site said
The spec table dated Vera Rubin's launch, its first production shipments, to September 2026, an estimate made before NVIDIA reported them.
Corrected to
August 2026: NVIDIA's investor presentation for its second fiscal 2027 quarter, published Aug 26, 2026, said it commenced production shipments of Vera Rubin in early August.
Where
/hardware spec table; llms-full.txt accelerator specs; /accelerators.json and /accelerators.csv.
Found by
A scheduled survey.
Release
PR #136

Hardware specs#

B200 and Rubin bandwidth came from superseded NVIDIA pages

The site said
B200 bandwidth read 8.0 TB/s, the DGX B200 figure, and Rubin read 22 TB/s with NVLink at 3.6 TB/s from older HGX pages, beside an unverified TSMC 3nm node.
Corrected to
HGX B200: 7.7 TB/s per GPU, from the HGX B200 column of NVIDIA's Blackwell datasheet. Rubin: 19.2 TB/s and NVLink 6 at 3 TB/s, from NVIDIA's Vera Rubin NVL72 page and datasheet, with no process node because NVIDIA stated none. NVIDIA's own pages disagreed on Rubin at the time, and the chip note said so.
Where
/hardware spec table; llms-full.txt accelerator specs; /hardware HBM bandwidth chart.
Found by
A scheduled survey.
Release
PR #109
Buildout#

Cluster-ledger dates, an unsourced chip count and two citations were wrong

The site said
The cluster ledger dated Stargate Saline's announcement to Jun 1, 2026 and Reliance Jamnagar's to Jan 2025, gave Stargate Abilene ~450K GB200/GB300-class accelerators with no source behind the figure, and cited the wrong sources for claims on Fairwater Wisconsin and Stargate Argentina.
Corrected to
Stargate Saline's announcement was dated Oct 30, 2025 and Jamnagar's Aug 29, 2024; Abilene was given ~403K B200/B300 projected at full buildout, labeled as a tracker estimate; and both claims were given their own sources.
Where
/buildout cluster ledger; buildout.json.
Found by
A scheduled survey.
Release
PR #109
GPU quotes#

Two desk-log entries read a venue change and a partial archive as price records

The site said
The desk log said “RTX 4090 floor cut −38.5%”, but Salad's lower tier had entered the comparison while Vast.ai's price rose. It also said “B200 floor at $6.25 — lowest in the archive's 81-day span”, but the daily price ledger shows $4.19 on Aug 5, 2026.
Corrected to
The log was changed to record a changed venue set as a venue change with its like-for-like move, and to claim a floor low only when the full daily ledger holds nothing lower in its span. The RTX 4090 entry became a venue change; the B200 floor-low entry was withdrawn.
Where
/log; RSS feed.
Found by
A review of published pages and data.
Release
PR #102
GPU quotes#

Chip-page price ranges hid that an endpoint was an old estimate

The site said
Chip pages printed all-market ranges such as “All-market access $1.99 → $6.00” on MI300X without saying that the $1.99 endpoint is a secondary estimate observed on Jul 6, 2026.
Corrected to
Ranges were changed to print an estimated endpoint's est flag and its own observation date, so the MI300X range marked $1.99 as an estimate observed on Jul 6, 2026.
Where
All-market ranges on the chip pages.
Found by
A scheduled survey.
Release
PR #109
Hardware specs#

Gaudi 3 throughput used Intel's superseded 2024 figure

The site said
Gaudi 3 was listed at 1,835 TF dense BF16 and FP8, the figure in Intel's 2024 Hot Chips deck, with a $15,650 list price.
Corrected to
1,678 TF BF16 and FP8, as Intel's July 2025 white paper (Rev. 3) gives at 900 W, and a $15,625 list price ($125,000 per eight-accelerator kit).
Where
/hardware spec table; llms-full.txt accelerator specs.
Found by
A scheduled survey.
Release
PR #109
Hardware specs#

GeForce tensor throughput used the 2× FP16-accumulate rates

The site said
RTX 4090 was listed at 330 TF dense BF16 and 661 TF FP8, and RTX 5090 at 419 TF and 838 TF: NVIDIA's FP16-accumulate rates, twice the FP32-accumulate figures that data-center datasheets give.
Corrected to
RTX 4090: 165.2 TF BF16 and 330.3 TF FP8. RTX 5090: 209.5 TF BF16, 419 TF FP8 and 1.68 PF FP4. These are the dense FP32-accumulate rates in NVIDIA's architecture whitepapers, so both cards' rental price per PFLOP-hour doubled.
Where
/hardware spec table and price per PFLOP-hour ranking; llms-full.txt accelerator specs.
Found by
A review of published pages and data.
Release
PR #102
Hardware specs#

Smaller hardware fixes: TPU notes, estimate flags, process nodes and a launch month

The site said
TPU v5p's note said it trained Gemini 1.0, TPU v5e's gave its INT8 rate as 394 TOPS, and TPU7x's said capacity required a supported reservation. The V100, A100 and H100 street prices ($10,000, $15,000 and $27,500) carried no estimate flag although only secondary sources give them. A100 and RTX 5090 process nodes read TSMC 7N and TSMC 4NP, and MI355X's launch month read Oct 2025.
Corrected to
The notes were changed to say that TPU v5p was announced alongside Gemini 1.0, which was trained on TPU v4 and v5e; that v5e INT8 is 393 TOPS; and that TPU7x had been generally available on demand since March 2026, with quota required. The three street prices were flagged as estimates, the nodes changed to TSMC N7 and TSMC 4N, and MI355X's launch month to Sep 2025.
Where
/hardware spec table; llms-full.txt accelerator specs; /hardware chip notes.
Found by
A scheduled survey.
Release
PR #109
GPU quotes#

Year-on-year and streak figures compared unlike series

The site said
The B200 tile read “+42% y/y”, a change computed by array position across a missing quarter and a methodology change. Streak copy called a single quarter near $3.99 a run of “straight quarters”, and each ticker arrow came from a different series than the value beside it.
Corrected to
Changes were made to follow calendar quarters within one methodology and to compare only the venues quoted at both ends; at the correction the B200 tile read “+16.9% like-for-like since Jul 23, 2026”. Streak copy was made to need at least two quarters, and each arrow to come from the series its value shows.
Where
Homepage B200 tile, lede and brief; market tape arrows; chip mastheads and The Board deltas; /gpu-cloud quote-snapshot read.
Found by
A review of published pages and data.
Release
PR #102
Hardware specs#

Maia 200 throughput was approximate

The site said
Maia 200 was listed at 5,000 TF FP8 and 10,000 TF FP4, flagged as estimates.
Corrected to
5,072 TF FP8 and 10,145 TF FP4, the peak-specification table in Microsoft's Maia 200 architecture deep dive. Its BF16 peak is a vector-unit rate, so the tensor BF16 field stayed empty.
Where
/hardware spec table; llms-full.txt accelerator specs.
Found by
A scheduled survey.
Release
PR #109
Hardware specs#

AMD's MI400-series flagship was listed at half its dense throughput

The site said
The Instinct MI400 row read AMD's figures as sparse and halved them: 10 PF FP8 and 20 PF FP4, with no BF16 rate. It also listed 19.6 TB/s, no board power, announced status and a Dec 2026 launch.
Corrected to
The row became the Instinct MI455X: 5,033 TF BF16, 20,133 TF FP8 and 40,265 TF MXFP4, which AMD publishes as dense rates, with 23.3 TB/s of HBM4 bandwidth, 2,500 W board power, ramping status and an estimated Oct 2026 launch.
Where
/hardware spec table; llms-full.txt accelerator specs; /hardware HBM bandwidth chart.
Found by
A scheduled survey.
Release
PR #109
Financials#

Microsoft's 2023 capex was understated

The site said
Microsoft's calendar-2023 capital expenditure read $41.0B.
Corrected to
$41.2B, the sum of Microsoft's four quarterly investor-relations figures, finance leases included.
Where
/buildout capex chart and table; homepage capex chart and table.
Found by
A scheduled survey.
Release
PR #109
Token prices#

Four current OpenAI models were missing from the token-price table

The site said
The current token-price table, reviewed on Oct 11, 2026, left out GPT-5.6 Sol, Terra and Luna (released Jul 9) and GPT-6 Sol (released Sep 22).
Corrected to
All four were added at their Standard prices per million input and output tokens: GPT-6 Sol $2 and $10, GPT-5.6 Sol $4 and $20, GPT-5.6 Terra $2 and $12, and GPT-5.6 Luna $0.20 and $1.20.
Where
/inference current price table; llms-full.txt token prices.
Found by
A scheduled survey.
Release
PR #109
GPU quotes#

Quotes last observed on Jul 23 were dated to a later survey

The site said
Vast.ai rows last observed on Jul 23, 2026 (H100 $1.73, H200 $3.93 and B300 $8.34 per GPU-hour) were cited with the date of the manual survey (Oct 11) in the H100, H200 and B300 chip-page FAQs and their structured data, and the H100 row also in the homepage lede and brief.
Corrected to
Each cited row was given its own observation date (“last observed Jul 23, 2026”), and the chip-page FAQ's cheapest-venue answer was changed to name the cheapest primary on-demand row separately from the marketplace-access floor.
Where
H100, H200 and B300 chip-page FAQ and FAQPage JSON-LD; homepage H100 lede and brief; venue-spread tile and notes; /gpu-cloud venue-spread panel.
Found by
A review of published pages and data.
Release
PR #102
GPU quotes#

Three quotes stayed listed after their sources stopped publishing them

The site said
Google Cloud (A4) B200 on-demand at $16.11 (est) stayed in the table although Google's pricing page shows no on-demand A4 price, and so did FluidStack H200 at $2.30 (est), although FluidStack publishes no GPU prices, and SF Compute H100 at $2.04, a market price SF Compute no longer publishes. The first two set the B200 all-market ceiling and the H200 all-market floor.
Corrected to
All three were retired from the quote table. With the Oct 14, 2026 update, the B200 all-market ceiling became AWS (p6) at $14.24 and the H200 all-market floor Vast.ai at $3.93.
Where
B200, H200 and H100 quote tables on /gpu-cloud and the chip pages; B200 and H200 all-market ranges.
Found by
A scheduled survey.
Release
PR #109
GPU quotes#

Vultr plans that cannot be rented on demand were listed as on-demand quotes

The site said
Four Vultr bare-metal plans that Vultr's plans API marks as not deployable on demand, with no locations, were listed as On-demand rows: H100 $2.99, B200 $8.50, MI300X $3.99 and MI355X $2.59 per GPU-hour. They made MI355X the cheapest dense compute on /hardware, set its chip-page title to “from $2.59”, and were the only venue in the daily H100 and B200 specialist medians.
Corrected to
The rule became that a Vultr plan counts as on-demand only when Vultr lists it as deployable on demand in at least one location. The four rows were retired from the quote table in the Oct 14, 2026 refresh, and no headline used them after it.
Where
H100, B200, MI300X and MI355X quote tables on /gpu-cloud and the chip pages; /hardware price per PFLOP-hour leader; MI355X chip-page title; daily H100 and B200 specialist-median history.
Found by
A review of published pages and data.
Release
PR #102 (the rule) and PR #104 (the rows retired)

Token prices#

An April 2026 token-price floor was presented as current

The site said
The GPT-4-class token-price floor, a benchmark-qualified series that ends in April 2026, was presented as the current cheapest option on the homepage Explore card, the ticker, the FAQ and /inference.
Corrected to
Each surface was changed to label it as archived April 2026 history, beside a current token-price table that compares list prices and does not rank model quality.
Where
Homepage Explore card, ticker and FAQ; /inference price-collapse chart and notes.
Found by
A review of published pages and data.
Release
PR #89 and PR #90
GPU quotes#

Three AWS Capacity Block quotes cited the On-Demand pricing page

The site said
The B300 (p6-b300), GB200 NVL72 (u-p6e) and Trainium2 (trn2) Capacity Block rows linked AWS's EC2 On-Demand pricing page instead of its Capacity Blocks pricing page. The B300 row showed $11.70 per GPU-hour.
Corrected to
They were changed to cite the EC2 Capacity Blocks pricing page, read on Oct 11, 2026: B300 $16.146 and GB200 NVL72 $10.582 per GPU-hour, and Trainium2 $2.235 per chip-hour, each with its instance configuration.
Where
B300, GB200 NVL72 and Trainium2 quote tables on /gpu-cloud and the chip pages; llms-full.txt quote table.
Found by
A scheduled survey.
Release
PR #89
Hardware specs#

B200 memory per GPU was overstated

The site said
B200 was listed with 192 GB of memory per GPU.
Corrected to
180 GB per GPU, as NVIDIA's HGX reference architecture specifies.
Where
/hardware spec table; llms-full.txt accelerator specs.
Found by
A review of published pages and data.
Release
PR #89
Hardware specs#

B300 specifications did not match NVIDIA's current HGX datasheet

The site said
B300 was listed with 15 PF dense FP4, 288 GB of memory, 8.0 TB/s and 1,400 W.
Corrected to
The HGX B300 column of NVIDIA's datasheet: 13.5 PF dense FP4 (108 PF per eight-GPU system divided by eight), 270 GB, 7.7 TB/s and 1,100 W. GB300 NVL72 lists different per-GPU figures, so the chip note recorded the discrepancy.
Where
/hardware spec table; llms-full.txt accelerator specs.
Found by
A review of published pages and data.
Release
PR #89
Market structure#

CME compute futures were still shown as launching Oct 5

The site said
The homepage, the About page and the venue monitor described CME's Silicon Data H100 and B200 rental-index futures as scheduled to launch on Oct 4, 2026, with a first trade date of Oct 5, pending CFTC review.
Corrected to
The venue record, and with it the homepage, the About page and the desk log, was changed to say that CME's Sep 28, 2026 notice had postponed the launch pending regulatory review, without a replacement date.
Where
Homepage futures brief; /about market-structure section and venue monitor; price-signal notes; /log and RSS feed.
Found by
A review of published pages and data.
Release
PR #90
Hardware specs#

MI355X throughput used AMD's sparse figures

The site said
MI355X was listed at 5 PF dense BF16, 10.1 PF FP8 and 20.1 PF FP4: AMD's sparse throughput, twice the dense rates.
Corrected to
2.5 PF BF16, 5 PF OCP-FP8 and 10.1 PF MXFP4, AMD's explicit dense specifications, so its rental price per PFLOP-hour doubled.
Where
/hardware spec table and price per PFLOP-hour ranking; llms-full.txt accelerator specs.
Found by
A review of published pages and data.
Release
PR #89
Financials#

Oracle's FY27 funding plan was described as new debt

The site said
/buildout said Oracle ran −$23.7B of free cash flow in FY26 and was raising ~$40B more debt.
Corrected to
/buildout was changed to report Oracle's own description, each figure beside its source: a ~$40B FY27 funding plan of debt and equity, no further debt issuance expected in calendar 2026, and $20B of common-stock sales completed in FY27 Q1.
Where
/buildout financing notes.
Found by
A review of published pages and data.
Release
PR #89
Hardware specs#

Rubin throughput was estimated from a sparse package figure

The site said
Rubin was listed with only an FP4 rate, 25 PF, estimated by halving NVIDIA's ~50 PF NVFP4 inference figure, with 20 TB/s of bandwidth and no BF16 or FP8 values.
Corrected to
The individual-GPU table on NVIDIA's HGX page at the time: 4 PF dense BF16, 17.5 PF FP8/FP6 training and 35 PF NVFP4 training, 22 TB/s, and NVLink 6 at 3.6 TB/s.
Where
/hardware spec table; llms-full.txt accelerator specs.
Found by
A review of published pages and data.
Release
PR #89
Hardware specs#

TPU memory was shown in GB, and published formats were missing

The site said
TPU v5p, v6e and v7 memory read 95, 32 and 192 GB although Google specifies GiB. FP8 was blank for v5p and v6e, BF16 was blank for v7, and v7 bandwidth read 7.37 TB/s.
Corrected to
95, 32 and 192 GiB; FP8 459 TF (v5p) and 918 TF (v6e); v7 BF16 2,307 TF; and v7 bandwidth 7.38 TB/s (7,380 GB/s), from Google's TPU7x architecture comparison.
Where
/hardware spec table; llms-full.txt accelerator specs.
Found by
A review of published pages and data.
Release
PR #89
Hardware specs#

Trainium2 throughput and memory unit were approximate

The site said
Trainium2 was listed at 650 TF dense BF16 and 1,300 TF FP8, flagged as estimates, with 96 GB of memory.
Corrected to
667 TF dense BF16, 1,299 TF FP8, 96 GiB and NeuronLink v3 at 1.28 TB/s, as AWS's Neuron documentation specifies.
Where
/hardware spec table and price per PFLOP-hour ranking; llms-full.txt accelerator specs.
Found by
A review of published pages and data.
Release
PR #89
Hardware specs#

Trainium3 dense BF16 was half its FP8 figure, not the published rate

The site said
Trainium3 was listed at 1.26 PF dense BF16, half its 2.52 PF FP8 figure, with no FP4 value and memory in GB.
Corrected to
671 TF dense BF16, 2.517 PF for both MXFP8 and MXFP4, 144 GiB of memory and NeuronLink v4 at 2.56 TB/s, as AWS's Neuron documentation specifies.
Where
/hardware spec table; llms-full.txt accelerator specs.
Found by
A review of published pages and data.
Release
PR #89