04BBuildout · frontier site· cluster ledger reviewed 2026-10-14

Prometheus AI datacenter

Meta · New Albany, Ohio. The ledger records it as operating, with 471 MW energized of 1 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
Meta
Location
New Albany, Ohio
Status
Operating
Current power
471 MWest — estimated / secondary-source figure
Planned power
1 GW
Accelerators
~166K B300 (→ ~363K by Q3 2028, tracker estimate)
Announced
No public date
First power
2025-10-14

Meta’s ~1 GW cluster target; nuclear supply deals (TerraPower, Oklo, Vistra) signed Jan 2026. The Oct 2026 tracker re-model (B300 chips) lowered the live estimate; the site did not shrink.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

← Every tracked site, capex and NVIDIA revenue

Background reading: Prometheus (Meta data center) on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.