Buildout · frontier site· cluster ledger evidence retained through 2026-10-25

El Paso campus AI datacenter

Meta · BlackRock · El Paso, Texas. The ledger records it as under construction, with 1 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
Meta · BlackRock
Location
El Paso, Texas
Status
Under construction
Current power
No public figure
Planned power
1 GWBasis not specified
Accelerators
AI-optimized campus (chips TBD)
Announced
2025-10-15
First power
No public date
Target online
2028

$14B venture with BlackRock (80/20); Meta sole initial occupant, operations expected 2028.

Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Planned power 1 GW of compute capacity, operating from 2028 — Meta,
  • Accelerators AI-optimized data center; chip platform not yet disclosed — Meta,
  • Announced Groundbreaking announced Oct 15, 2025 — Meta,
  • Target online 1 GW of compute capacity, operating from 2028 — Meta,

Connected labs, contracts and evidence

Each link names its recorded relationship. Sharing a source does not establish that a contract funds this site; a lab reference does not assign the site’s whole capacity to that lab.