Buildout · frontier site· cluster ledger evidence retained through 2026-10-25
Hyperion AI datacenter
Meta · Richland Parish, Louisiana. The ledger records it as under construction, with 5 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- Meta
- Location
- Richland Parish, Louisiana
- Status
- Under construction
- Current power
- No public figure
- Planned power
- 5 GWBasis not specified
- Accelerators
- NVIDIA Rubin-era planned (~469K chips modeled)
- Announced
- 2024-12
- First power
- No public date
- Target online
- 2030
Planned figure is Meta’s 5 GW target, which the tracker says lacks concrete evidence at this site alone; it models ≈1.6 GW IT and first power in 2028.
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Planned power Richland Parish expanding to 5GW of compute capacity; more than $50B invested — Meta,
- Accelerators · est ≈469K NVIDIA Rubin chips projected for Q1 2028 (tracker estimate) — Epoch AI data-center directory,
- Announced · est Meta’s Richland Parish data center announced December 2024 — Louisiana Economic Development,
- Target online · est Meta plans to bring two gigawatts of data center capacity online by 2030 with Hyperion (Meta spokesperson Ashley Gabriel); no date given for the full 5 GW — TechCrunch (quoting a Meta spokesperson),
Background reading: Hyperion (Meta data center) on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.