Hyperion AI datacenter

Meta · Richland Parish, Louisiana. The ledger records it as under construction, with 5 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
Meta
Location
Richland Parish, Louisiana
Status
Under construction
Current power
No public figure
Planned power
5 GWBasis not specified
Accelerators
NVIDIA Rubin-era planned (~469K chips modeled)
Announced
2024-12
First power
No public date
Target online
2030

Planned figure is Meta’s 5 GW target, which the tracker says lacks concrete evidence at this site alone; it models ≈1.6 GW IT and first power in 2028.

Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Planned power Richland Parish expanding to 5GW of compute capacity; more than $50B invested — Meta,
  • Accelerators · est ≈469K NVIDIA Rubin chips projected for Q1 2028 (tracker estimate) — Epoch AI data-center directory,
  • Announced · est Meta’s Richland Parish data center announced December 2024 — Louisiana Economic Development,
  • Target online · est Meta plans to bring two gigawatts of data center capacity online by 2030 with Hyperion (Meta spokesperson Ashley Gabriel); no date given for the full 5 GW — TechCrunch (quoting a Meta spokesperson),