Hyperion AI datacenter
Meta · Richland Parish, Louisiana. The ledger records it as under construction, with 5 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- Meta
- Location
- Richland Parish, Louisiana
- Status
- Building
- Current power
- No public figure
- Planned power
- 5 GW
- Accelerators
- NVIDIA Rubin-era planned (~469K chips modeled)
- Announced
- 2024-12
- First power
- No public date
Planned figure is Meta’s 5 GW target, which the tracker says lacks concrete evidence at this site alone; it models ≈1.6 GW IT and first power in 2028.
Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Planned power Richland Parish expanding to 5GW of compute capacity; more than $50B invested — Meta,
- Accelerators · est ≈469K NVIDIA Rubin chips projected for Q1 2028 (tracker estimate) — Epoch AI data-center directory,
- Announced · est Meta’s Richland Parish data center announced December 2024 — Louisiana Economic Development,
Background reading: Hyperion (Meta data center) on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.