Lebanon campus AI datacenter
Meta · Lebanon, Indiana. The ledger records it as under construction, with 1 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- Meta
- Location
- Lebanon, Indiana
- Status
- Under construction
- Current power
- No public figure
- Planned power
- 1 GWBasis not specified
- Accelerators
- AI workloads and core products (chips undisclosed)
- Announced
- 2026-02-11
- First power
- No public date
- Target online
- No public date
Boone County campus, an investment of over $10B; closed-loop liquid cooling. Meta gives no operating date.
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Planned power A 1GW campus in Lebanon, Indiana, designed to deliver 1GW of capacity once operational (over $10B investment) — Meta,
- Accelerators Will handle both AI workloads and Meta’s core products; chips not disclosed — Meta,
- Announced Meta breaks ground on its Lebanon, Indiana data center, Feb 11, 2026 — Meta,