04BBuildout · frontier site· cluster ledger reviewed 2026-10-14

Stargate Abilene AI datacenter

OpenAI · Oracle · Crusoe · Abilene, Texas. The ledger records it as operating, with 618 MW energized of 1.2 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
OpenAI · Oracle · Crusoe
Location
Abilene, Texas
Status
Operating
Current power
618 MWest — estimated / secondary-source figure
Planned power
1.2 GWest — estimated / secondary-source figure
Accelerators
~403K B200/B300 projected at full buildout (tracker estimate)
Announced
2025-01
First power
2025-09

Flagship of the Stargate program — 6 of 8 buildings delivered by Sep 2026 (Oracle); planned figure is campus facility power (tracker-modeled IT ≈ 0.84 GW).

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Current power · est 6 of 8 campus buildings, 618 MW and 75% of total capacity, delivered to the customer (Oracle Q1 FY27 call, Sep 10, 2026) — Oracle earnings call (The Motley Fool transcript),
  • Planned power · est 1.2 GW campus at completion (Q4 2026 target) — Epoch AI — Stargate US sites,
  • Accelerators · est 100.8K B200 + 302.4K B300 projected for Q4 2026 (403.2K total; tracker estimate) — Epoch AI data-center directory,
  • Announced Stargate program unveiled Jan 21, 2025, with the buildout “starting in Texas” — OpenAI,
  • First power First two buildings energized within a year of June 2024 groundbreaking — Crusoe,
← Every tracked site, capex and NVIDIA revenue

Background reading: Abilene data center (Stargate) on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.