Stargate Milam County AI datacenter

OpenAI · SB Energy · Texas. The ledger records it as under construction, with 1.2 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
OpenAI · SB Energy
Location
Texas
Status
Building
Current power
No public figure
Planned power
1.2 GW
Accelerators
GB300-era NVIDIA (≈2.5M H100-equivalents projected)
Announced
2025-09-23
First power
No public date

SB Energy (SoftBank) builds and operates the site; its first building’s construction completion is filed for Oct 15, 2026 (Texas TDLR), with no energization announced yet.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Planned power OpenAI’s previously announced 1.2 GW data center site in Milam County — SB Energy,
  • Accelerators · est ≈2.5M H100-equivalents of compute projected — Epoch AI — Stargate US sites,
  • Announced Named in the five-new-Stargate-sites announcement — OpenAI,