Stargate Milam County AI datacenter
OpenAI · SB Energy · Texas. The ledger records it as under construction, with 1.2 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- OpenAI · SB Energy
- Location
- Texas
- Status
- Under construction
- Current power
- No public figure
- Planned power
- 1.2 GWBasis not specified
- Accelerators
- GB300-era NVIDIA (≈2.5M H100-equivalents projected)
- Announced
- 2025-09-23
- First power
- No public date
- Target online
- 2028
SB Energy (SoftBank) builds and operates the site; its first building’s construction completion is filed for Oct 15, 2026 (Texas TDLR), with no energization announced yet.
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Planned power OpenAI’s previously announced 1.2 GW data center site in Milam County — SB Energy,
- Accelerators · est ≈2.5M H100-equivalents of compute projected — Epoch AI — Stargate US sites,
- Announced Named in the five-new-Stargate-sites announcement — OpenAI,
- Target online · est 857 MW IT projected for Q4 2028; all buildings finished and site fully operational projected Dec 31, 2028, a conservative estimate (tracker estimate) — Epoch AI data-center directory,
Connected labs, contracts and evidence
Each link names its recorded relationship. Sharing a source does not establish that a contract funds this site; a lab reference does not assign the site’s whole capacity to that lab.
- OpenAI and Oracle →Cites the same source document ·
- OpenAI and SB Energy →Cites the same source document ·
Background reading: Stargate Project on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.