04BBuildout · frontier site· cluster ledger reviewed 2026-10-14
Stargate Lordstown AI datacenter
OpenAI · SoftBank · Foxconn · Lordstown, Ohio. The ledger records it as under construction, with 300 MW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- OpenAI · SoftBank · Foxconn
- Location
- Lordstown, Ohio
- Status
- Building
- Current power
- No public figure
- Planned power
- 300 MWest — estimated / secondary-source figure
- Accelerators
- NVIDIA Rubin (≈0.55M H100-equivalents projected)
- Announced
- 2025-09-23
- First power
- No public date
SoftBank/Foxconn advanced data-center design; ground broken 2025 and targeted operational 2026 (Sep 2025), while the tracker now projects Q1 2027.
Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Planned power · est <0.3 GW modeled (tracker estimate) — Epoch AI — Stargate US sites,
- Accelerators · est ≈546K H100-equivalents (≈61.5K Rubin) projected for Q1 2027 (tracker estimate) — Epoch AI data-center directory,
- Announced Named in the five-new-Stargate-sites announcement; ground already broken — OpenAI,
Background reading: Stargate Project on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.