04BBuildout · frontier site· cluster ledger reviewed 2026-10-14

Stargate Shackelford County AI datacenter

OpenAI · Oracle · Vantage · Texas. The ledger records it as under construction, with 2 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
OpenAI · Oracle · Vantage
Location
Texas
Status
Building
Current power
No public figure
Planned power
2 GWest — estimated / secondary-source figure
Accelerators
NVIDIA Rubin-era (≈4.6M H100-equivalents projected)
Announced
2025-09-23
First power
No public date

Vantage “Frontier” campus; Vantage targets first delivery in H2 2026, while the tracker projects first IT load in 2027.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Planned power · est ≈2.0 GW planned (tracker estimate) — Epoch AI — Stargate US sites,
  • Accelerators · est ≈4.56M H100-equivalents projected at full build, Q4 2028 (Rubin-era; tracker estimate) — Epoch AI data-center directory,
  • Announced Named in the five-new-Stargate-sites announcement — OpenAI,
← Every tracked site, capex and NVIDIA revenue

Background reading: Stargate Project on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.