04BBuildout · frontier site· cluster ledger reviewed 2026-10-14
Stargate Saline Township AI datacenter
OpenAI · Oracle · Related Digital · Michigan. The ledger records it as under construction, with 1.4 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- OpenAI · Oracle · Related Digital
- Location
- Michigan
- Status
- Building
- Current power
- No public figure
- Planned power
- 1.4 GWest — estimated / secondary-source figure
- Accelerators
- GB300-era NVIDIA (≈2.9M H100-equivalents projected)
- Announced
- 2025-10-30
- First power
- No public date
Related Digital build southwest of Ann Arbor; announced Oct 2025, construction celebrated Jun 1, 2026 (first of three buildings then nearing completion).
Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Planned power · est ≈1.4 GW planned, targeting Q4 2028 (tracker estimate) — Epoch AI — Stargate US sites,
- Accelerators · est ≈2.9M H100-equivalents of compute projected — Epoch AI — Stargate US sites,
- Announced OpenAI, Oracle and Related Digital announce the Saline Township (Michigan) Stargate site — Related Digital,
Background reading: Stargate Michigan on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.