Buildout · frontier site· cluster ledger evidence retained through 2026-10-25

Stargate Saline Township AI datacenter

OpenAI · Oracle · Related Digital · Michigan. The ledger records it as under construction, with 1.4 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
OpenAI · Oracle · Related Digital
Location
Michigan
Status
Under construction
Current power
No public figure
Planned power
1.4 GWest — estimated / secondary-source figureBasis not specified
Accelerators
GB300-era NVIDIA (≈2.9M H100-equivalents projected)
Announced
2025-10-30
First power
No public date
Target online
2028

Related Digital build southwest of Ann Arbor; announced Oct 2025, construction celebrated Jun 1, 2026 (first of three buildings then nearing completion).

Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

Connected labs, contracts and evidence

Each link names its recorded relationship. Sharing a source does not establish that a contract funds this site; a lab reference does not assign the site’s whole capacity to that lab.

← Every tracked site, capex and NVIDIA revenue

Background reading: Stargate Michigan on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.