Stargate Saline Township AI datacenter
OpenAI · Oracle · Related Digital · Michigan. The ledger records it as under construction, with 1.4 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- OpenAI · Oracle · Related Digital
- Location
- Michigan
- Status
- Under construction
- Current power
- No public figure
- Planned power
- 1.4 GWest — estimated / secondary-source figureBasis not specified
- Accelerators
- GB300-era NVIDIA (≈2.9M H100-equivalents projected)
- Announced
- 2025-10-30
- First power
- No public date
- Target online
- 2028
Related Digital build southwest of Ann Arbor; announced Oct 2025, construction celebrated Jun 1, 2026 (first of three buildings then nearing completion).
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Planned power · est ≈1.4 GW planned, targeting Q4 2028 (tracker estimate) — Epoch AI — Stargate US sites,
- Accelerators · est ≈2.9M H100-equivalents of compute projected — Epoch AI — Stargate US sites,
- Announced OpenAI, Oracle and Related Digital announce the Saline Township (Michigan) Stargate site — Related Digital,
- Target online · est ≈1.4 GW planned, targeting Q4 2028 (tracker estimate) — Epoch AI — Stargate US sites,
Connected labs, contracts and evidence
Each link names its recorded relationship. Sharing a source does not establish that a contract funds this site; a lab reference does not assign the site’s whole capacity to that lab.
- OpenAI and Oracle →Cites the same source document ·
Background reading: Stargate Michigan on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.