Stargate Saline Township AI datacenter

OpenAI · Oracle · Related Digital · Michigan. The ledger records it as under construction, with 1.4 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
OpenAI · Oracle · Related Digital
Location
Michigan
Status
Building
Current power
No public figure
Planned power
1.4 GWest — estimated / secondary-source figure
Accelerators
GB300-era NVIDIA (≈2.9M H100-equivalents projected)
Announced
2025-10-30
First power
No public date

Related Digital build southwest of Ann Arbor; announced Oct 2025, construction celebrated Jun 1, 2026 (first of three buildings then nearing completion).

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.