Stargate UAE AI datacenter
G42 · OpenAI · Oracle · Abu Dhabi, UAE. The ledger records it as under construction, with 1 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- G42 · OpenAI · Oracle
- Location
- Abu Dhabi, UAE
- Status
- Building
- Current power
- No public figure
- Planned power
- 1 GW
- Accelerators
- NVIDIA GB300 systems
- Announced
- 2025-05-22
- First power
- No public date
1 GW cluster anchoring the 5 GW UAE–US AI campus. The first 200 MW was due in Q3 2026 (Mubadala, Dec 2025); no go-live had been announced by mid-Oct 2026, and Sep 2026 press reports describe a hardened redesign.
Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Planned power 1 GW Stargate UAE cluster within a 5 GW campus — OpenAI,
- Accelerators NVIDIA Grace Blackwell GB300 systems — OpenAI,
- Announced Stargate UAE announced May 22, 2025 — OpenAI,
- Status First 200 MW phase progressing toward planned 2026 delivery — G42,
- Status · est Under construction; first 200 MW (Buildings 1–2) projected operational by Dec 2026 (tracker estimate) — Epoch AI data-center directory,