04BBuildout · frontier site· cluster ledger reviewed 2026-10-14

Stargate UAE AI datacenter

G42 · OpenAI · Oracle · Abu Dhabi, UAE. The ledger records it as under construction, with 1 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
G42 · OpenAI · Oracle
Location
Abu Dhabi, UAE
Status
Building
Current power
No public figure
Planned power
1 GW
Accelerators
NVIDIA GB300 systems
Announced
2025-05-22
First power
No public date

1 GW cluster anchoring the 5 GW UAE–US AI campus. The first 200 MW was due in Q3 2026 (Mubadala, Dec 2025); no go-live had been announced by mid-Oct 2026, and Sep 2026 press reports describe a hardened redesign.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Planned power 1 GW Stargate UAE cluster within a 5 GW campus — OpenAI,
  • Accelerators NVIDIA Grace Blackwell GB300 systems — OpenAI,
  • Announced Stargate UAE announced May 22, 2025 — OpenAI,
  • Status First 200 MW phase progressing toward planned 2026 delivery — G42,
  • Status · est Under construction; first 200 MW (Buildings 1–2) projected operational by Dec 2026 (tracker estimate) — Epoch AI data-center directory,