04BBuildout · frontier site· cluster ledger reviewed 2026-10-14

Stargate Doña Ana County (Project Jupiter) AI datacenter

OpenAI · Oracle · STACK · New Mexico. The ledger records it as under construction, with 2.5 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
OpenAI · Oracle · STACK
Location
New Mexico
Status
Building
Current power
No public figure
Planned power
2.5 GWest — estimated / secondary-source figure
Accelerators
NVIDIA (≈5.1M H100-equivalents projected)
Announced
2025-09-23
First power
No public date

Power plan switched to an on-site Bloom fuel-cell microgrid (Apr 2026); planned figure is facility power (tracker-modeled IT ≈ 1.75 GW).

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Planned power Up to 2.45 GW of installed Bloom fuel-cell capacity to power Project Jupiter (power supply, not IT load) — Oracle,
  • Planned power · est 1,750 MW IT (≈2.45 GW facility) at completion, Q4 2028 (tracker estimate) — Epoch AI data-center directory,
  • Accelerators · est ≈5.1M H100-equivalents projected at completion, Q4 2028 (tracker estimate) — Epoch AI data-center directory,
  • Announced Named in the five-new-Stargate-sites announcement — OpenAI,
← Every tracked site, capex and NVIDIA revenue

Background reading: Stargate Project on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.