Buildout · frontier site· cluster ledger evidence retained through 2026-10-25
Colossus 2 AI datacenter
SpaceXAI (SpaceX, formerly xAI) · Memphis, Tennessee. The ledger records it as operating, with 946 MW current and 2 GW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- SpaceXAI (SpaceX, formerly xAI)
- Location
- Memphis, Tennessee
- Status
- Operating
- Current power
- 946 MWest — estimated / secondary-source figureIT load
- Planned power
- 2 GWest — estimated / secondary-source figureCampus / facility power
- Accelerators
- ~550K GB200/GB300 operating (Sep 2026); +660K GB300 targeted by late Dec 2026
- Announced
- No public date
- First power
- 2025-10
- Target online
- 2027-02
Spans Memphis, TN and Southaven, MS; a third building (projected ~Feb 2027) takes the site toward 2 GW of facility power. Anthropic also contracted GPU capacity here in 2026.
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Current power · est ≥946 MW IT (≈1.28 GW facility) at the Jun 2026 observation (tracker estimate) — Epoch AI data-center directory,
- Planned power · est 1,531 MW IT (≈2.07 GW facility) projected once Building 3 completes, ~Feb 2027 (tracker estimate) — Epoch AI data-center directory,
- Accelerators · est 550K operating (110K GB200 + 440K GB300) as of Sep 25, 2026; +660K GB300 targeted by late Dec 2026 — Tom’s Hardware (quoting Elon Musk on X),
- First power · est First ~110K-GB200 (~210 MW) cluster online by the Oct 19, 2025 observation (tracker estimate) — Epoch AI data-center directory,
- Target online · est 1,531 MW IT (≈2.07 GW facility) projected once Building 3 completes, ~Feb 2027 (tracker estimate) — Epoch AI data-center directory,
Connected labs, contracts and evidence
Each link names its recorded relationship. Sharing a source does not establish that a contract funds this site; a lab reference does not assign the site’s whole capacity to that lab.
- Anthropic and SpaceX →Cites the same source document ·
Background reading: xAI Colossus 2 on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.