04BBuildout · frontier site· cluster ledger reviewed 2026-10-14

Colossus 2 AI datacenter

SpaceXAI (SpaceX, formerly xAI) · Memphis, Tennessee. The ledger records it as operating, with 946 MW energized of 2 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
SpaceXAI (SpaceX, formerly xAI)
Location
Memphis, Tennessee
Status
Operating
Current power
946 MWest — estimated / secondary-source figure
Planned power
2 GWest — estimated / secondary-source figure
Accelerators
~550K GB200/GB300 operating (Sep 2026); +660K GB300 targeted by late Dec 2026
Announced
No public date
First power
2025-10

Spans Memphis, TN and Southaven, MS; a third building (projected ~Feb 2027) takes the site toward 2 GW of facility power. Anthropic also contracted GPU capacity here in 2026.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

← Every tracked site, capex and NVIDIA revenue

Background reading: xAI Colossus 2 on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.