Buildout · frontier site· cluster ledger evidence retained through 2026-10-25

Colossus 2 AI datacenter

SpaceXAI (SpaceX, formerly xAI) · Memphis, Tennessee. The ledger records it as operating, with 946 MW current and 2 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
SpaceXAI (SpaceX, formerly xAI)
Location
Memphis, Tennessee
Status
Operating
Current power
946 MWest — estimated / secondary-source figureIT load
Planned power
2 GWest — estimated / secondary-source figureCampus / facility power
Accelerators
~550K GB200/GB300 operating (Sep 2026); +660K GB300 targeted by late Dec 2026
Announced
No public date
First power
2025-10
Target online
2027-02

Spans Memphis, TN and Southaven, MS; a third building (projected ~Feb 2027) takes the site toward 2 GW of facility power. Anthropic also contracted GPU capacity here in 2026.

Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Current power · est ≥946 MW IT (≈1.28 GW facility) at the Jun 2026 observation (tracker estimate) — Epoch AI data-center directory,
  • Planned power · est 1,531 MW IT (≈2.07 GW facility) projected once Building 3 completes, ~Feb 2027 (tracker estimate) — Epoch AI data-center directory,
  • Accelerators · est 550K operating (110K GB200 + 440K GB300) as of Sep 25, 2026; +660K GB300 targeted by late Dec 2026 — Tom’s Hardware (quoting Elon Musk on X),
  • First power · est First ~110K-GB200 (~210 MW) cluster online by the Oct 19, 2025 observation (tracker estimate) — Epoch AI data-center directory,
  • Target online · est 1,531 MW IT (≈2.07 GW facility) projected once Building 3 completes, ~Feb 2027 (tracker estimate) — Epoch AI data-center directory,

Connected labs, contracts and evidence

Each link names its recorded relationship. Sharing a source does not establish that a contract funds this site; a lab reference does not assign the site’s whole capacity to that lab.

← Every tracked site, capex and NVIDIA revenue

Background reading: xAI Colossus 2 on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.