Buildout · frontier site· cluster ledger evidence retained through 2026-10-25
Polaris Forge 1 AI datacenter
CoreWeave · Applied Digital · Ellendale, North Dakota. The ledger records it as operating, with 250 MW current and 400 MW planned. Every figure below traces to a dated public source.
Ledger figures
- Operator
- CoreWeave · Applied Digital
- Location
- Ellendale, North Dakota
- Status
- Operating
- Current power
- 250 MWIT load
- Planned power
- 400 MWIT load
- Accelerators
- CoreWeave GPU cloud capacity (NVIDIA, models undisclosed)
- Announced
- No public date
- First power
- 2025-10
- Target online
- 2027
Applied Digital campus fully leased to CoreWeave across three buildings (~$11B contracted revenue); Buildings 1–2 (250 MW) live by Oct 2026, third 150 MW building under construction.
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Current power 250 MW fully operational critical IT load (Buildings 1–2) — Applied Digital,
- Planned power 400 MW critical IT load contracted at full buildout — Applied Digital,
- Accelerators · est Leased to CoreWeave; GPU models not disclosed — Applied Digital,
- First power Phase I (first 50 MW) ready for service Oct 2025; Building 1 fully energized Nov 24, 2025 — Applied Digital,
- Target online New 150MW lease (third building) anticipated to be at full capacity and ready for service in 2027, bringing CoreWeave to 400MW at Polaris Forge 1 — Applied Digital,
Background reading: Applied Digital on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.