04BBuildout · frontier site· cluster ledger evidence retained through 2026-10-25

Helios AI datacenter

CoreWeave · Galaxy · Texas. The ledger records it as operating, with 133 MW current and 1.6 GW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
CoreWeave · Galaxy
Location
Texas
Status
Operating
Current power
133 MWIT load
Planned power
1.6 GWBasis not specified
Accelerators
CoreWeave GPU cloud capacity (models undisclosed)
Announced
No public date
First power
No public date
Target online
2027

Former bitcoin mine in West Texas converted for AI/HPC. Phase I (~200 MW gross, 133 MW critical IT) delivered to CoreWeave on a 15-year lease; CoreWeave has committed to 526 MW of critical IT across Phases I–III (the 800 MW of gross power first approved). Planned figure is Galaxy’s total approved power capacity (ERCOT approved a further 830 MW in Jan 2026), not contracted IT load; Galaxy cites potential to scale to as much as 3.6 GW.

Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Current power Phase I complete: approximately 200 MW of gross power, including 133 MW of critical IT load, delivered to CoreWeave; rent began Q2 2026 — Galaxy,
  • Planned power Total approved power capacity at Helios expanded to 1.63 GW, with potential to scale to as much as 3.6 GW — Galaxy,
  • Planned power ERCOT approves an additional 830 MW at Helios, doubling total approved power capacity to over 1.6 GW — Galaxy,
  • Accelerators · est Leased to CoreWeave for AI and HPC workloads; GPU models not disclosed — Galaxy,
  • Status Phase I delivered; Phase II (260 MW critical IT) data hall deliveries expected to begin in H1 2027; CoreWeave committed to 526 MW of critical IT across Phases I–III — Galaxy,
  • Target online Phase II (260 MW critical IT) data hall deliveries expected to commence in H1 2027 (next phase only) — Galaxy,
← Every tracked site, capex and NVIDIA revenue

Background reading: CoreWeave on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.