Buildout · frontier site· cluster ledger evidence retained through 2026-10-25

Omaha TPU campus AI datacenter

Google · Omaha, Nebraska. The ledger records it as operating, with 237 MW current and 395 MW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
Google
Location
Omaha, Nebraska
Status
Operating
Current power
237 MWest — estimated / secondary-source figureIT load
Planned power
395 MWest — estimated / secondary-source figureIT load
Accelerators
~382K TPUs (v5e/v5p/v6e/v7, tracker estimate)
Announced
No public date
First power
2024-04
Target online
2028

Google’s flagship disclosed-scale TPU training campus; expansion projected through Q3 2028.

Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure