Buildout · frontier site· cluster ledger evidence retained through 2026-10-25

Fairwater Atlanta AI datacenter

Microsoft · Fayetteville, Georgia. The ledger records it as operating, with 636 MW energized. Every figure below traces to a dated public source.

Ledger figures

Operator
Microsoft
Location
Fayetteville, Georgia
Status
Operating
Current power
636 MWest — estimated / secondary-source figureIT load
Planned power
636 MWest — estimated / secondary-source figureIT load
Accelerators
~304K B200 (tracker estimate)
Announced
2025-11-12
First power
2025-10-14
Target online
No public date

QTS-built, grid-only design (no UPS/gen-sets); linked with Wisconsin into one “AI superfactory” WAN.

Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.