04BBuildout · frontier site· cluster ledger reviewed 2026-10-14
Fairwater Atlanta AI datacenter
Microsoft · Fayetteville, Georgia. The ledger records it as operating, with 636 MW energized. Every figure below traces to a dated public source.
Ledger figures
- Operator
- Microsoft
- Location
- Fayetteville, Georgia
- Status
- Operating
- Current power
- 636 MWest — estimated / secondary-source figure
- Planned power
- 636 MWest — estimated / secondary-source figure
- Accelerators
- ~304K B200 (tracker estimate)
- Announced
- 2025-11-12
- First power
- 2025-10-14
QTS-built, grid-only design (no UPS/gen-sets); linked with Wisconsin into one “AI superfactory” WAN.
Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Current power · est ≈636 MW IT live across buildings 1–4 (tracker estimate) — Epoch AI data-center directory,
- Planned power · est ≈636 MW IT at current buildout (tracker estimate) — Epoch AI data-center directory,
- Accelerators · est ≈304K NVIDIA B200 (tracker estimate) — Epoch AI data-center directory,
- Announced Microsoft unveils the Fairwater Atlanta site, Nov 12, 2025 — Microsoft,
- First power · est Buildings 1–2 operational Oct 14, 2025 (tracker estimate) — Epoch AI data-center directory,
Background reading: Microsoft Fairwater on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.