04BBuildout · frontier site· cluster ledger reviewed 2026-10-14

Fairwater Atlanta AI datacenter

Microsoft · Fayetteville, Georgia. The ledger records it as operating, with 636 MW energized. Every figure below traces to a dated public source.

Ledger figures

Operator
Microsoft
Location
Fayetteville, Georgia
Status
Operating
Current power
636 MWest — estimated / secondary-source figure
Planned power
636 MWest — estimated / secondary-source figure
Accelerators
~304K B200 (tracker estimate)
Announced
2025-11-12
First power
2025-10-14

QTS-built, grid-only design (no UPS/gen-sets); linked with Wisconsin into one “AI superfactory” WAN.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

← Every tracked site, capex and NVIDIA revenue

Background reading: Microsoft Fairwater on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.