Buildout · frontier site· cluster ledger evidence retained through 2026-10-25
Fairwater Atlanta AI datacenter
Microsoft · Fayetteville, Georgia. The ledger records it as operating, with 636 MW energized. Every figure below traces to a dated public source.
Ledger figures
- Operator
- Microsoft
- Location
- Fayetteville, Georgia
- Status
- Operating
- Current power
- 636 MWest — estimated / secondary-source figureIT load
- Planned power
- 636 MWest — estimated / secondary-source figureIT load
- Accelerators
- ~304K B200 (tracker estimate)
- Announced
- 2025-11-12
- First power
- 2025-10-14
- Target online
- No public date
QTS-built, grid-only design (no UPS/gen-sets); linked with Wisconsin into one “AI superfactory” WAN.
Current and planned figures may use different power bases. Planned power is the end state, not additional capacity to add to the current figure. An unspecified basis remains unknown. A figure marked est rests on at least one source other than the operator’s own announcement.
Sources behind each figure
- Current power · est ≈636 MW IT live across buildings 1–4 (tracker estimate) — Epoch AI data-center directory,
- Planned power · est ≈636 MW IT at current buildout (tracker estimate) — Epoch AI data-center directory,
- Accelerators · est ≈304K NVIDIA B200 (tracker estimate) — Epoch AI data-center directory,
- Announced Microsoft unveils the Fairwater Atlanta site, Nov 12, 2025 — Microsoft,
- First power · est Buildings 1–2 operational Oct 14, 2025 (tracker estimate) — Epoch AI data-center directory,
Background reading: Microsoft Fairwater on AI Wiki. AI Wiki is run by the same team as AI Compute Tracker.