Nscale Narvik (announced as Stargate Norway) AI datacenter

Nscale (Microsoft offtake) · Narvik, Nordland, Norway. The ledger records it as under construction, with 230 MW planned. Every figure below traces to a dated public source.

Ledger figures

Operator
Nscale (Microsoft offtake)
Location
Narvik, Nordland, Norway
Status
Building
Current power
No public figure
Planned power
230 MW
Accelerators
≈52K NVIDIA GB300 (Microsoft, multi-year) + 30K+ Rubin from 2027
Announced
2025-07-31
First power
No public date

Hydropower-fed campus, now run solely by Nscale (the Aker joint venture was folded in, Mar 2026) with Microsoft as offtaker; OpenAI reportedly left lease talks (Apr 2026). Ambition to add a further 290 MW beyond the initial 230 MW.

Power figures are IT load where trackers publish it and campus power where only the operator’s headline exists; each source below names its basis. A figure marked est rests on at least one source other than the operator’s own announcement.

Sources behind each figure

  • Planned power 230 MW initial capacity (ambition for +290 MW) — Nscale,
  • Accelerators Aker-Nscale joint venture to deliver ~52,000 NVIDIA GB300 GPUs to Microsoft from Narvik (multi-year agreement) — Nscale,
  • Accelerators More than 30,000 NVIDIA Rubin GPUs added at the 230 MW Narvik campus for Microsoft, in 2027 — Nscale,
  • Status · est Under construction; no buildings operational at the Jul 2026 imagery; 92 MW projected by end-2026 (tracker estimate) — Epoch AI data-center directory,
  • Announced Nscale/Aker/OpenAI announce Stargate Norway Jul 31, 2025 — Nscale,