GPU price & market log: October 2026
Entries dated Oct 15 – Oct 31, with their full explanation, source evidence and permanent links. October 2026 runs to 2 pages.
37 of 74 entries in October 2026, page 1 of 2 · Source archives through .
Browse all 117 entries by month
Each month contains its complete record. Month links open with fresh filters.
Newest entriesFilters apply to this page. Corrections use their recording dates; later market milestones are marked Scheduled when they fall after the source archives.
Event date range
Inclusive event dates, which can differ from evidence or archive snapshot dates.
Showing 37 of 37 events on this page
Price rise Verda raised 6 posted GPU prices by 4.6% to 5.1% in the week of Oct 26, 2026Verda · A100 80GB, B200, B300, H100, H200, L40S
In the week of Oct 26, 2026, Verda changed these posted prices in steps of less than 5% each. First and last price per GPU-hour and net change: A100 80GB, 1-GPU instance 1A100.22V: $2.149 → $2.248, +4.6% in 5 changes between Oct 26 and Oct 31, 2026; B200, 1-GPU instance 1B200.30V: $8.439 → $8.869, +5.1% in 5 changes between Oct 26 and Oct 31, 2026; B300, 1-GPU instance 1B300.30V: $10.80 → $11.35, +5.1% in 5 changes between Oct 26 and Oct 31, 2026; H100, 1-GPU instance 1H100.80S.30V: $4.56 → $4.793, +5.1% in 5 changes between Oct 26 and Oct 31, 2026; H200, 1-GPU instance 1H200.141S.44V: $5.947 → $6.25, +5.1% in 5 changes between Oct 26 and Oct 31, 2026; L40S, 1-GPU instance 1L40S.20V: $1.809 → $1.901, +5.1% in 5 changes between Oct 26 and Oct 31, 2026. Posted list prices, not transactions.
Source: https://api.verda.com/v1/instance-types
Permalink for Verda raised 6 posted GPU prices by 4.6% to 5.1% in the week of Oct 26, 2026
Curve sessions 6 forward-curve sessions archived · week of Oct 26, 2026Forward board
Archived sessions 2026-10-26, 2026-10-27, 2026-10-28, 2026-10-29, 2026-10-30 and 2026-10-31 — each at its dated permalink; notable moves are logged separately.
Derived from archived curve sessions 2026-10-26 · 2026-10-27 · 2026-10-28 · 2026-10-29 · 2026-10-30 · 2026-10-31 · Data: Kalshi (KalshiEX LLC)
Permalink for 6 forward-curve sessions archived · week of Oct 26, 2026
Venue change MI300X typical price: Hot Aisle added, Vultr removed between the Oct 11 and Oct 25, 2026 quote snapshotsMI300X · typical price
The venue set changed between the Oct 11 and Oct 25, 2026 quote snapshots: Hot Aisle entered at $2.99 and Vultr ($3.99) left. The archived typical price moved $3.99 → $2.99 (−25.1%), which is not a like-for-like price change. No venue was quoted in both quote snapshots, so there is no like-for-like move.
Derived from archived quote days 2026-10-11 · 2026-10-25
Curve sessions 7 forward-curve sessions archived · week of Oct 19, 2026Forward board
Archived sessions 2026-10-19, 2026-10-20, 2026-10-21, 2026-10-22, 2026-10-23, 2026-10-24 and 2026-10-25 — each at its dated permalink; notable moves are logged separately.
Derived from archived curve sessions 2026-10-19 · 2026-10-20 · 2026-10-21 · 2026-10-22 · 2026-10-23 · 2026-10-24 · 2026-10-25 · Data: Kalshi (KalshiEX LLC)
Permalink for 7 forward-curve sessions archived · week of Oct 19, 2026
Correction Correction: Grok estimates omitted documented batch and long-context cache ratesToken prices
Was: Grok 4.7, 4.6 and 4.5 had no recorded batch rates, and no Grok row had a combined batch cache-hit rate or long-context discounts. The estimator used its disclosed full-rate fallback for missing rates and said batch and caching were not stacked. The earlier reproduced Grok 4.7 workload of 100 million input tokens, no output, 100% batch and 100% cache therefore estimated $200. Corrected to: A scoped reading of xAI's pricing page recorded the stated 20% batch discount for Grok 4.7, 4.6, 4.5 and 4.3, including cached tokens and long context. The estimator used only these explicit combined and tier-specific rates, giving $40 for that short-context Grok 4.7 workload. Grok Build 0.1 remained outside the batch discount list. All other models kept their observations and missing-discount fallbacks. Where: /tools/ API estimator; /ai-model-api-prices/ and Grok model details; /watchlist/ API estimates; /token-prices.json and /token-prices.csv. Found by a review of published pages and data.
Evidence: xAI pricing and exact-model batch discounts · Recorded rates · Full record
Permalink for Correction: Grok estimates omitted documented batch and long-context cache rates
Correction Correction: HUMAIN’s Kingdom-wide capacity target was classified as one campusBuildout
Was: The HUMAIN AI factories row lacked a multi-site marker, so its up-to-500 MW target was classified as one Riyadh campus. Its retained NVIDIA claim and ledger note described a program across factories in Saudi Arabia. Corrected to: The row was explicitly classified as a multi-site program. Campus counts and single-campus rankings excluded it, while the program comparison retained its up-to-500 MW target, original claims, dates and stable identifier. No capacity figure, milestone, source publication date or dataset review date was changed. Where: /buildout campus counts, entry-type filters and comparisons; /buildout/humain-riyadh/ and buildout ledger exports. Found by a review of published pages and data.
Evidence: NVIDIA: HUMAIN AI factories in Saudi Arabia · HUMAIN program’s retained capacity claims and sources · Full record
Permalink for Correction: HUMAIN’s Kingdom-wide capacity target was classified as one campus
Correction Correction: A headline capex multiple compared guidance with actuals on different accounting basesFinancials
Was: The Infrastructure financial summary presented combined 2026 guidance as approximately 1.8 times 2025 actuals. Amazon's retained guidance was net cash capex while its historical figures were gross purchases, and Microsoft's retained guidance included a lease reclassification. Detailed notes described the differences, but the headline multiple did not qualify its comparison. Corrected to: The headline multiple was removed. Individual company guidance retained its recorded ranges or point estimates, reporting periods, source dates and accounting bases beside the figures. Historical values were preserved, with basis changes disclosed rather than interpreted as like-for-like spending growth. No financial observation or dataset review date was changed. Where: /buildout financial summary, guidance comparison and chart explanations. Found by a review of published pages and data.
Evidence: Company guidance, reporting periods and accounting basis · Full record
Correction Correction: Hardware and rental FAQs selected older quotes than the current comparisonGPU quotes
Was: Hardware and the rental comparison used different quote selectors, producing inconsistent MI300X and MI355X headlines. Some cheapest-provider FAQ answers also selected the older reviewed snapshot without identifying the differing price selection. The separate retired-provider correction records why the comparison’s then-selected Vultr offers were ineligible. Corrected to: Hardware rental economics, rental summaries, specification strips, cheapest-provider FAQs and their structured data were aligned to the comparison’s current eligible offer selection and original dates. Historical survey statements retained explicit dates. No provider observation or immutable price history was rewritten. Where: /hardware/ rental economics; /gpu-rental-prices/ detail summaries, FAQs and structured data. Found by a review of published pages and data.
Evidence: Current rental offers · Hardware rental economics · Full record
Permalink for Correction: Hardware and rental FAQs selected older quotes than the current comparison
Correction Correction: Custom GPU comparisons did not follow the rental index’s current price selectionGPU quotes
Was: The custom comparison page derived rental prices only from the reviewed quote snapshot while the main GPU index and Watchlist could select newer eligible daily observations. A selected accelerator could therefore show a different reference price, coverage and observation date without identifying the differing data selection. Corrected to: The custom comparison’s reference, specialist and big-cloud prices were prepared from the GPU index’s exact current profiles, including their latest eligible provider observations, mixed daily and reviewed source dates, retained older prices and comparable historical changes. Deferred history was verified against every selected full profile before plotting. Reviewed marketplace quotes remained separate. No recorded source price, observation date or specification review date was rewritten. Where: /compare/ current rental prices, source dates and inline history; /chart-data/compare.json prepared comparison catalog. Found by a review of published pages and data.
Evidence: GPU rental index’s current prices and dated coverage · Custom accelerator comparison · Full record
Correction Correction: Homepage rental headlines used an older price selection than the comparisonGPU quotes
Was: The homepage hero selected rental headlines from the reviewed quote snapshot while its rental teaser and the core comparison could select newer daily observations. On October 24 the H100 floor carried an October 14 observation in the hero and an October 23 observation in the teaser. Corrected to: The duplicated reviewed headline figures were replaced with a comparison entry point. Homepage offer cards were prepared from the core comparison’s exact current offers, including original dates, freshness, provider coverage and recorded instance terms. No source observation or historical price was rewritten. Where: / homepage rental headlines and offer cards. Found by a review of published pages and data.
Evidence: Homepage current offer cards · Current rental comparison and original observations · Full record
Correction Correction: Retired Vultr plans returned as the MI300X and MI355X typical pricesGPU quotes
Was: Current rental prices accepted a provider missing from the reviewed quotes when its daily observation was timed after the review. The Oct 14, 2026 review that retired Vultr's non-deployable plans carries a date without a time, so Vultr's observations from 09:38 that day counted as newer. Its $3.99 MI300X and $2.59 MI355X plans became the only providers behind those chips' typical prices, on the watchlist, the chip pages and the GPU rental overview. Corrected to: A review recorded as a bare date was treated as covering its whole day, so a provider absent from it needed a collection on a later day to count as current. The Vultr plans left the current prices, and MI300X and MI355X used their remaining reviewed provider quotes. Exactly timed reviews kept the exact comparison. Where: MI300X and MI355X typical prices on /gpu-rental-prices and the chip pages; /watchlist GPU rows. Found by a review of published pages and data.
Evidence: MI300X rental prices · MI355X rental prices · Full record
Permalink for Correction: Retired Vultr plans returned as the MI300X and MI355X typical prices
Correction Correction: Watchlist reference prices did not follow the main rental index’s current data selectionGPU quotes
Was: The Watchlist prepared GPU reference prices from the reviewed quote snapshot while the main GPU index could select newer eligible daily observations. The same GPU could therefore show a different reference price and date without identifying the differing source selection. API price review dates also appeared under a generic Observed label. Corrected to: Watchlist reference prices, coverage, observation dates and comparable changes were prepared from the main rental index’s exact selected profile. Eligible daily collections and dated reviewed fallbacks were distinguished. API review dates were labeled Reviewed. No source observation, recorded price, review date or historical billing condition was rewritten. Where: /watchlist reference prices, source labels and evidence dates; /chart-data/watchlist.json prepared public catalog. Found by a review of published pages and data.
Evidence: Current GPU rental reference prices and dated coverage · Watchlist current profiles and source clocks · Full record
Correction Correction: Two launch months and three purchase-price estimates lacked supportHardware specs
Was: The B300's first availability read Jul 2025, the month the first GB300 NVL72 rack shipped, and the MI325X's read Dec 2024, when AMD had only said it would ship. The V100, A100 and MI300X purchase-price estimates ($13,000, $12,000 and $15,000) rested on no reputable report, and the Gaudi 3 row carried no estimate flag although its launch month is unconfirmed. Corrected to: The B300 moved to Sep 2025, when Supermicro began volume shipments of HGX B300 systems, and the MI325X to Feb 2025, when Vultr became the first cloud to offer it; both stayed estimates. The V100 and MI300X estimates were removed, the A100's became the roughly $10,000 CNBC reported in February 2023, and the Gaudi 3 row was flagged as an estimate. Where: /hardware spec table; llms-full.txt accelerator specs; /accelerators.json and /accelerators.csv (launch, est). Found by a review of published pages and data.
Evidence: Supermicro: volume shipments of NVIDIA Blackwell Ultra systems (Sep 11, 2025) · Vultr: first cloud to offer AMD Instinct MI325X (Feb 18, 2025) · CNBC: Nvidia's A100 is the $10,000 chip powering the race for A.I. · Full record
Permalink for Correction: Two launch months and three purchase-price estimates lacked support
Correction Correction: API estimates applied cache discounts to unsupported batch trafficToken prices
Was: For Grok 4.7, 100 million monthly input tokens, zero output, 100% batch and 100% cache produced a $50 estimate despite the stated standard-rate fallback implying $200. The estimator also ranked workloads beyond recorded model context limits. Corrected to: Requested batch traffic retained its allocation when no batch rate was recorded and used the standard rate without an overlapping cache discount. The reproduced Grok workload estimated $200. Models exceeding their recorded context limit were excluded from priced rankings, while unknown limits remained explicitly unknown. Where: /tools/ API bill estimator; /ai-model-api-prices/ workload estimates. Found by a review of published pages and data. Corrected again on Oct 25, 2026: Grok estimates omitted documented batch and long-context cache rates.
Evidence: API bill estimator and eligibility rules · Recorded model rates and limits · Full record
Permalink for Correction: API estimates applied cache discounts to unsupported batch traffic
Correction Correction: An unsupported date was given for Claude Sonnet 5's standard priceToken prices
Was: The token-price table said Claude Sonnet 5's introductory $2 and $10 per million input and output tokens were made its standard price on Aug 10, 2026. Anthropic's pricing page states the change but no date for it. Corrected to: The date was removed. The row kept the $2 and $10 standard price and the note that the rise to $3 and $15 planned for Sep 1, 2026 would not occur, both of which Anthropic's pricing page states. Where: /ai-model-api-prices/ table and Claude Sonnet 5 model page; /token-prices.json and /token-prices.csv; llms-full.txt token prices. Found by a review of published pages and data.
Evidence: Anthropic API pricing · Full record
Permalink for Correction: An unsupported date was given for Claude Sonnet 5's standard price
Correction Correction: Gemini 3.6 Flash's scheduled price rise was missing from the token-price tableToken prices
Was: The token-price table, reviewed on Oct 11, 2026, listed Gemini 3.6 Flash at $0.75 per million input tokens and $3.75 per million output tokens with no note, although Google's pricing page scheduled the same change for it as for Gemini 3.8 Flash. Corrected to: The row was given Google's stated terms: $0.75 and $3.75 through Dec 31, 2026, then $1.50 and $7.50 from Jan 1, 2027, in its Terms and in the payloads' temporary-price fields. Where: /ai-model-api-prices/ table and Gemini 3.6 Flash model page; /token-prices.json and /token-prices.csv; llms-full.txt token prices. Found by a review of published pages and data.
Evidence: Gemini Developer API pricing · Full record
Correction Correction: Homepage API savings were stated as general discounts instead of model-specific termsToken prices
Was: The homepage displayed roughly 50% batch and 90% cached-input discounts and said production pays below list. Those constants did not represent every model’s recorded terms or establish realized customer bills. Corrected to: The general savings claim was removed. The homepage showed current model examples with separate input and output list prices, review dates, and each model’s recorded cache, batch and context terms. Missing prices remained explicitly unrecorded; no provider price was changed. Where: / homepage API price preview. Found by a review of published pages and data.
Evidence: Current model-level prices and billing terms · Model pricing dataset · Full record
Correction Correction: Older provider-history rows inherited later configuration descriptionsGPU quotes
Was: Provider history grouped observations by GPU, provider, SKU, region and billing basis without including the configuration description. A later description replaced the metadata for the whole series. Nebius H100, H200, B200 and B300 observations dated October 11 and 14, 2026 consequently carried their October 20 descriptions instead of their original recorded descriptions. Corrected to: The immutable observations were re-exported with separate configuration identities, preserving each observation's recorded description. The metadata repair did not change its recorded price or observation date. New observations include a configuration fingerprint in their comparison identity, and current-quote fallbacks match the actual configuration and evidence before reusing a historical point. Lambda instance resources and Hyperstack's explicitly labeled maximum resource limits were retained in the new collector's configurations. Where: /price-history.json and /price-history.csv provider series; Per-GPU history payloads and provider-history charts. Found by a review of published pages and data.
Evidence: GPU price history with recorded provider configurations · Nebius GPU pricing documentation · Full record
Permalink for Correction: Older provider-history rows inherited later configuration descriptions
Correction Correction: Full-power electricity estimates were described as guaranteed cost floorsHardware specs
Was: The Hardware page labeled chip TDP multiplied by assumed facility overhead and a tracked state's industrial electricity rate as a lower bound on rental cost, displaying a greater-than-or-equal sign. Its explanation assumed full-TDP draw for the rented hour, although actual chip power depends on the workload. Corrected to: The calculation was relabeled as an approximate electricity-cost scenario at full published chip power, with ordinary rounding and no bound inequality. The explanation retained the stated power, facility-overhead and electricity-rate inputs and their data date, and identified workload dependence and omitted host-server power and capital costs. It made no claim to measured consumption or a guaranteed minimum rental cost. Where: /hardware electricity-cost scenario and explanatory research. Found by a review of published pages and data.
Evidence: Full-power electricity scenario and stated assumptions · Full record
Permalink for Correction: Full-power electricity estimates were described as guaranteed cost floors
Market structure CFTC — Comment period on compute derivatives closesCFTC
The comment period on the CFTC’s request for comment closes. The CFTC’s NYMEX review extension and ICE’s OCPI listing notice both point to this request. Status after: comment closed. Source: CFTC letter to CME Group (comment period closing Oct 20, 2026).
Source: https://www.cftc.gov/filings/documents/2026/orgdcmnymexcompcontr260921.pdf
Permalink for CFTC — Comment period on compute derivatives closes
Correction Correction: Prices from five GPU clouds whose terms bar reuse, and three aggregator estimates, were publishedGPU quotes
Was: The site published 22 hand-surveyed list prices from CoreWeave (6), Crusoe (5), RunPod (8), Salad (2) and Voltage Park (1), the price ledger's earlier observations of all five and 59 archived CoreWeave and Crusoe list prices, although each provider's own terms bar that use: CoreWeave's Terms of Use (July 8, 2024) bar displaying site content in connection with products or services that are not CoreWeave's; Crusoe's Website Terms of Use (version 1.0, Aug 12, 2024) bar copying, reproducing, publishing or displaying its content without written permission; Salad's Terms of Service (Sep 29, 2026) bar using or displaying any element of the site without written consent; RunPod's Terms of Service (Mar 24, 2026) bar systematic retrieval to compile a collection or database; Voltage Park's Terms of Service (Feb 5, 2025) bar collecting data from its platform by any automatic or manual process without written permission. The quote tables also listed three secondary estimates observed on Jul 6, 2026 beside providers' own prices, two of them under a provider's name: the RunPod MI300X price of $1.99 and the TensorWave MI355X price of $2.95 were GetDeploying's figures, and the V100 market average of $0.99 was AIMultiple's; the ledger kept 13 GetDeploying-sourced estimates in all. The quarterly price-history charts drew a typical-price line of midpoints compiled from specialist list prices that included CoreWeave's, Crusoe's and RunPod's, and the homepage H100 insight read a 2023–25 price collapse from it. Corrected to: Every value from the seven sources was taken off the site's pages, payloads and downloads: the 25 rows, 67 price-ledger observations and the 38 class-aggregate points they could have fed, the 59 archived list prices, their venues in the archived quote snapshots, and the quarterly typical-price line with the figures read from it (its flat-quarter streak and level, the H100, H200 and B200 calendar y/y changes, the H100 collapse years and the B200 “+20% y/y” annotation); the quarterly charts kept the big-cloud list price. The H100 cheapest on-demand price became Hyperstack's $3.20, and the /hardware price per PFLOP-hour ranking was led by B200 instead of H100. The L40S cheapest on-demand price and typical price became Nebius's $1.55, a single venue's “from” price for its smallest preset, and A100 80GB's typical price, left with two specialist venues, became their $1.35–$2.79 range. GB200 NVL72 and MI300X lost their specialist quotes, so their cheapest on-demand prices became Oracle OCI's $16.00 and $6.00 and both left the price per PFLOP-hour ranking, as did RTX 4090 and RTX 5090, which lost every on-demand and marketplace quote and were given Beam's serverless per-second rates ($0.6912 and $1.0908 per GPU-hour, GPU only). The MI300X and MI355X all-market ranges lost their estimated low ends, which left MI355X with Oracle OCI's $8.60 alone, and V100 kept the three providers' own prices it already headlined. ACT.GB200-NVL72, ACT.RTX-4090 and ACT.RTX-5090 .SPEC-MED@primary-on-demand-v1 and ACT.RTX-4090 and ACT.RTX-5090 .MKT-FLOOR@marketplace-access-v1 were marked withdrawn, never to be reused; of the .SPEC-MED series of B300, B200, H200, H100, A100 80GB, MI300X and L40S, which stayed citable, those of H200, A100 80GB and L40S kept no ledger point at the withdrawal, only the current quote table's typical price; the re-survey's observations of Oct 20, 2026 gave H200's and L40S's a point that day (H200 from Nebius's $5.40 and Together AI's $5.99, L40S from Nebius's $1.55 alone) and A100 80GB's none. The CoreWeave, Crusoe and RunPod provider pages were redirected to the provider matrix, the RTX 4090 and RTX 5090 class-band embeds, badges and class-band chart tables kept their addresses with the withdrawal's notice instead of data (their price-history embeds kept theirs, drawing each chip's serverless prices from Oct 20, 2026), three desk-log entries computed from those prices became withdrawal notices under the same permalinks, B200's typical-price venue change of Oct 11, 2026 kept its permalink with its like-for-like move recomputed without CoreWeave's and RunPod's prices (+16.9% became +7.5%), and the closed evidence-digest day of Oct 11, 2026 got a new root without three of their digests. Earlier corrections records keep the figures they quote. Where: H100, H200, B200, B300, GB200 NVL72, A100 80GB, MI300X, MI355X, L40S, RTX 4090, RTX 5090 and V100 quote tables, ranges, chip-page titles and withdrawal notices on /gpu-cloud and the chip pages; the TPU v5p chip page's price history and withdrawal notice; the chip pages' social cards (og:image); /gpu-cloud/providers/ matrix and its other billing models; the CoreWeave, Crusoe and RunPod provider pages, redirected to the matrix and out of the sitemap; each other provider page's rank of its prices among its chip's quotes; /hardware price per PFLOP-hour ranking and the accelerator table's rental prices; /gpu-cloud/archived-prices/ and the chip pages' archived-price notes; homepage H100 quarterly chart, brief, lede and insight; the Board tiles of B300, B200, GB200 NVL72, H200, H100, A100 80GB, MI300X, L40S, RTX 5090 and RTX 4090, the market tape, and the GPU-cloud section's provider count and H100 price; the A100 80GB, H200 and B200 quarterly histories; /compare/ reference prices of a100-80gb-vs-h100, b200-vs-b300, h100-vs-b200, h100-vs-h200, h200-vs-b200 and l40s-vs-a100-80gb; /compare/h100-vs-mi300x/ and /compare/rtx-4090-vs-rtx-5090/ (noindex, out of the sitemap); /tools quote check; the H100, H200, B200, B300, GB200 NVL72, A100 80GB, MI300X and L40S badges, the badge gallery (/data/badges/) and the site badge's provider count; RTX 4090 and RTX 5090 class-band and price-history embeds, badges and class-band chart tables; GB200 NVL72 and MI300X class-band embeds, the GB200 NVL72 price-history embed and the embed gallery (/data/embeds/); the Board's citations (/chart-data/reference-citations.json); the core-review status on every page, whose manual GPU quotes kept inputs from Jul 6, 2026; four entries on /log and /log/2026-10/, /feed.xml and the H200, RTX 4090, RTX 5090 and B200 chip feeds; /price-history.json, the chip shards and /price-history.csv; /archive/quotes/ dated permalinks, the /archive/ index's aggregate counts and the class-band charts; /quotes.json, /quotes.csv, /reference-prices.json and /status.json; llms-full.txt quote rows and citable series; /evidence, /evidence/refs.csv, /evidence/digests.json and /evidence/digests/; the licence and attribution lines of the payloads, /data and /openapi.json, which no longer credit RunPod or Voltage Park; /terms third-party notices and /about. Found by a review of published pages and data.
Evidence: CoreWeave Terms of Use (July 8, 2024), CoreWeave Sites’ Content · Crusoe Website Terms of Use (version 1.0, August 12, 2024), Intellectual Property · SaladCloud Terms of Service (September 29, 2026), 6. Use Restrictions · RunPod Terms of Service (March 24, 2026), §9 · Voltage Park Terms of Service (February 5, 2025), §5.2(h) · Methodology: GPU rental prices (providers’ own prices only) · The withdrawn citable series (withdrawnSeries) · Archived list prices, without the withdrawn sources · Full record
Correction Correction: Vast.ai marketplace prices were published although Vast's terms bar their use in price comparisonsGPU quotes
Was: The site published Vast.ai marketplace asks that its scripts collected: six automated quote rows (H100, H200, B200, B300, RTX 4090 and RTX 5090), the price ledger's 4-hourly Vast.ai observations and the daily marketplace-access floors built from them, the hourly marketplace tape, and quarterly marketplace floors compiled from archived marketplace observations. Vast.ai's Terms of Use (version 2026-09-01) bar automated retrieval (Prohibited Activities 7), use in an index, benchmark or pricing-comparison service (10(ii)), redistribution (10(iii)) and scripts (18). Corrected to: Every Vast.ai value was taken off the site's tables, charts, archives, payloads, feeds and downloads, and its collectors stopped. The marketplace-access floors of B300, B200 and H200 ended with their Vast.ai points, and A100 80GB's with its quarterly line, so ACT.B300, ACT.B200, ACT.H200 and ACT.A100-80GB .MKT-FLOOR@marketplace-access-v1 were marked withdrawn, never to be reused; H100's floor kept only SF Compute's $2.04 of Jul 6, 2026, which /quotes.json then served as its latest point and which the archived quote snapshots of Jul 23, Oct 11 and Oct 13, 2026 and the H100 class-band chart then read as its marketplace floor, and the RTX 4090 and RTX 5090 floors kept none of their ledger points and were left to Salad's current rows. Archived quote snapshots were served without the Vast.ai rows, the seven desk-log entries computed from them became withdrawal notices under the same permalinks, and every evidence-digest day got a new root without the Vast.ai digests, closed days included, or left the manifest if it held only them. The quarterly marketplace floors were removed and the tape emptied. Earlier corrections records keep the Vast.ai figures they quote; the ledger shards they cite no longer show those points. Where: H100, H200, B200, B300, RTX 4090 and RTX 5090 quote tables, marketplace-access floors and spot board on /gpu-cloud and the chip pages; the marketplace tape on /gpu-cloud, /marketplace-tape.json and its llms.txt entry; homepage lede, brief, Board tiles and venue-spread tile; /gpu-cloud/providers other billing models; /compare/ marketplace rows: h100-vs-h200, rtx-4090-vs-rtx-5090, a100-80gb-vs-h100, b200-vs-b300, h100-vs-b200, h100-vs-mi300x and h200-vs-b200; seven entries on /log and /log/2026-10/, /feed.xml and the chip feeds; /price-history.json, the chip shards and /price-history.csv; /archive/quotes/ dated permalinks, the /archive/ index's aggregate counts and the class-band charts; chart embeds and their data tables; the RTX 4090 and RTX 5090 social cards' quote-evidence dates (og:image); homepage H100 quarterly chart and the A100 80GB, H200 and B200 quarterly charts; /quotes.json, /quotes.csv and /reference-prices.json; llms-full.txt quote rows and citable series; /evidence, /evidence/digests.json, /evidence/digests/ and /evidence/refs.csv; /status.json quote counts, automated observations and citable-series count; the site badge's provider count (/badge/site.svg); /terms third-party notices and /about. Found by a review of published pages and data. Corrected again on Oct 20, 2026: Prices from five GPU clouds whose terms bar reuse, and three aggregator estimates, were published.
Evidence: Vast.ai Terms of Use (version 2026-09-01), Prohibited Activities 7, 10(ii), 10(iii) and 18 · The withdrawn marketplace tape · The withdrawn citable series (withdrawnSeries) · The evidence digests the withdrawal removed (withdrawals) · Full record
Correction Correction: Three DDR5 spot prices relayed from DRAMeXchange were published although its terms bar using them without consentHardware specs
Was: The /hardware memory cost chart plotted three DDR5 spot prices per gigabyte, $3.42 for Sep 2025, $12.42 for Nov 2025 and $13.60 for Dec 2025, converted from 16Gb chip spot prices that Resell Calendar relayed from DRAMeXchange, although DRAMeXchange's terms bar using its prices without its consent. Corrected to: The three DDR5 points were removed, and with them the chart's DDR5 series; the chart kept its four HBM3e contract-price estimates from Silicon Analysts. Where: /hardware memory cost chart, its table view and CSV; /chart-data/tables/hardware-memory-cost.json. Found by a review of published pages and data.
Evidence: Memory cost context chart (HBM3e estimates only) · Its data table · Full record
Withdrawn entry B200 marketplace floor entry withdrawn: it was computed from Vast.ai pricesB200 · marketplace floor
Vast.ai marketplace prices were withdrawn on 2026-10-20: Vast's terms bar their use in price comparisons. This entry was computed from those prices, so it was withdrawn with them.
Permalink for B200 marketplace floor entry withdrawn: it was computed from Vast.ai prices
Withdrawn entry H100 marketplace floor entry withdrawn: it was computed from Vast.ai pricesH100 · marketplace floor
Vast.ai marketplace prices were withdrawn on 2026-10-20: Vast's terms bar their use in price comparisons. This entry was computed from those prices, so it was withdrawn with them.
Permalink for H100 marketplace floor entry withdrawn: it was computed from Vast.ai prices
Withdrawn entry H200 marketplace floor entry withdrawn: it was computed from Vast.ai pricesH200 · marketplace floor
Vast.ai marketplace prices were withdrawn on 2026-10-20: Vast's terms bar their use in price comparisons. This entry was computed from those prices, so it was withdrawn with them.
Permalink for H200 marketplace floor entry withdrawn: it was computed from Vast.ai prices
Curve sessions 7 forward-curve sessions archived · week of Oct 12, 2026Forward board
Archived sessions 2026-10-12, 2026-10-13, 2026-10-14, 2026-10-15, 2026-10-16, 2026-10-17 and 2026-10-18 — each at its dated permalink; notable moves are logged separately.
Derived from archived curve sessions 2026-10-12 · 2026-10-13 · 2026-10-14 · 2026-10-15 · 2026-10-16 · 2026-10-17 · 2026-10-18 · Data: Kalshi (KalshiEX LLC)
Permalink for 7 forward-curve sessions archived · week of Oct 12, 2026
Methodology 13 archived sessions re-derived under kalshi-ladder-median-50-v2+unsmoothed-v1Forward board
Archived sessions from Jul 23, 2026 through Oct 14, 2026 whose raw Kalshi ladders were retained were re-derived from those ladders on Oct 15, 2026, replacing kalshi-ladder-median-50-v1+smooth-121x2-after-front-v1; the first affected session is Jul 23, 2026. Each permalink records the re-derivation and keeps the values first published there. Sessions without retained ladders keep the methodology they were published under, and movement is only ever computed inside one methodology.
Derived from archived curve sessions 2026-07-23 · 2026-07-24 · 2026-07-25 · 2026-07-26 · 2026-07-27 · 2026-07-28 · 2026-07-31 · 2026-08-22 · 2026-08-28 · 2026-10-11 · 2026-10-12 · 2026-10-13 · 2026-10-14 · Data: Kalshi (KalshiEX LLC)
Permalink for 13 archived sessions re-derived under kalshi-ladder-median-50-v2+unsmoothed-v1
Correction Correction: The OpenAI-Cerebras deal carried Reuters' $10 billion instead of the value Cerebras statesBuildout
Was: The compute deals ledger listed OpenAI's January 2026 deal with Cerebras at more than $10 billion, a press-reported figure Reuters attributed to a source. Corrected to: More than $20 billion, the value Cerebras gave the deal in its IPO prospectus (Form S-1/A, May 4, 2026), listed as a contract value stated by a party to the deal. Where: /deals ledger table; /deals.json. Found by a review of published pages and data.
Evidence: Cerebras Systems registration statement (Form S-1/A), May 4, 2026 · Full record
Correction Correction: The $300 billion OpenAI-Oracle deal was listed as unconfirmed by either companyBuildout
Was: The compute deals ledger listed the September 2025 OpenAI-Oracle contract at about $300 billion as a press report that neither company had confirmed, with a press-reported value. Corrected to: More than $300 billion over five years, the value OpenAI gave its July 2025 Oracle partnership on September 23, 2025, listed as a contract value stated by a party to the deal; Oracle had not stated the figure, and neither company had confirmed the reported 2027 start. Where: /deals ledger table; /deals.json. Found by a review of published pages and data.
Evidence: OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites (OpenAI, September 23, 2025) · Full record
Correction Correction: Oracle's FY27 capex guidance has an Oracle sourceFinancials
Was: /buildout cited a secondary press report for Oracle's ~$70B FY27 net cash capex guidance, marked it a secondary source, and said no Oracle release, slide deck or transcript stated the figure. Corrected to: The guidance row cited Oracle's own Q4 FY26 earnings slides (June 10, 2026, slide 15), which state ~$70B of FY27 net cash outlay for capex, and was no longer marked secondary; the note said the ~$90–95B gross range rests on secondary reports of the June 10 call. The $70B figure did not change. Where: /buildout capex source notes (Oracle); /financials.json Oracle guidance row. Found by a review of published pages and data.
Evidence: Oracle Q4 FY26 earnings presentation, slide 15 · Full record
Permalink for Correction: Oracle's FY27 capex guidance has an Oracle source
Correction Correction: Forward curves read thin Kalshi ladders as price levels, and archived sessions were called unchangeableForward curves
Was: The forward curves and their archive priced every strike from its bid/ask midpoint or last trade, repaired each ladder with a running minimum and smoothed the back months, so thin books published as levels. The Oct 12, 2026 session showed B200 Jan ’27 at $6.98, quality-passed, though its bids and asks bounded it only at $5.67 or more. /archive said an archived session’s values never change. Corrected to: The 13 archived sessions from Jul 23 to Oct 14, 2026 whose raw Kalshi ladders were retained were re-derived from those ladders under estimator v2: each point carries its bid/ask bracket, only identified points draw a line or feed a move, and an unidentified point is shown as its bracket, never as a price. Oct 12’s B200 Jan ’27 became an unidentified point whose bids put it at $5.67 or more. Each re-derived permalink was changed to keep the values first published (rederived.superseded), and /archive to say a closed session changes only through a recorded re-derivation. Where: /archive/curves/{date}.json permalinks for Jul 23–Oct 14, 2026; curve time machine; /archive; /log; homepage forward curves, terminal and chip pages. Found by a review of published pages and data.
Evidence: Oct 12, 2026 curve session, with the values first published · Jul 23, 2026 curve session, the first re-derived · Full record
Correction Correction: The quarterly big-cloud floors misread several archived list pricesGPU quotes
Was: The quarterly price-history charts put the H100's big-cloud floor at $12.29 per GPU-hour from 2024Q2 to 2025Q1 and $6.88 in 2025Q2, the A100 80GB's at $4.10 in 2021Q1 and 2021Q3 and $2.74 from 2025Q3 (the A100 40GB's price), and the H200's at $10.71 in 2024Q4 and 2025Q1 and $7.91 in 2025Q2. Corrected to: Read from archived price lists: the H100's floor was Google Cloud's $11.06 from 2024Q2 to 2025Q2, since AWS cut its price only in June 2025; the A100 80GB's was AWS's $3.43 from 2025Q3, with no archived price before Azure's record of December 2021; and the H200's was $10.60 in 2025Q1 and 2025Q2, with no archived price in 2024Q4. Where: H100, A100 80GB and H200 chip pages: quarterly price history; homepage H100 price history. Found by a review of published pages and data.
Evidence: Google Cloud VM instance pricing, archived May 21, 2024 (a3-highgpu-8g) · AWS Price List, EC2 offer version of Aug 28, 2025 (p4de.24xlarge) · AWS Price List, EC2 offer version of Mar 31, 2025 (p5en.48xlarge) · Full record
Permalink for Correction: The quarterly big-cloud floors misread several archived list prices
Correction Correction: The memory-cost insight rested on a B300 price no reputable source givesHardware specs
Was: The /hardware memory-cost insight put the B300's 270 GB of HBM3e at roughly $4,200, about 9% of a ~$45,000 street price; no reputable source gives a per-unit B300 price, and NVIDIA publishes none. Corrected to: The B300 was left without a street price, as were the H200 and MI325X, for which no reputable per-unit price was found either. The insight moved to the B200, whose ~$35,000 estimate is the midpoint of the $30,000 to $40,000 range NVIDIA's CEO gave CNBC: its 180 GB of HBM3e came to roughly $2,800, about 8% of that price. Where: /hardware memory-cost insight. Found by a scheduled survey.
Evidence: CNBC: Nvidia's Blackwell AI chip will cost more than $30,000, CEO says · Full record
Permalink for Correction: The memory-cost insight rested on a B300 price no reputable source gives
Correction Correction: GB200 NVL72 was priced per PFLOP-hour at the HGX B200's dense rateHardware specs
Was: The price per PFLOP-hour ranking divided GB200 NVL72's cheapest specialist on-demand price by the HGX B200's 2,250 TF dense BF16, so CoreWeave's $10.50 per GPU-hour read as $4.67 per PFLOP-hour. Corrected to: GB200 NVL72 got a spec row of its own from the GB200 NVL72 column of NVIDIA's Blackwell datasheet, 2,500 TF dense BF16 per GPU (its 5 PF sparse figure, halved as the datasheet's footnote directs), so the same $10.50 per GPU-hour read as $4.20 per PFLOP-hour. Where: /hardware price per PFLOP-hour ranking. Found by a review of published pages and data. Corrected again on Oct 20, 2026: Prices from five GPU clouds whose terms bar reuse, and three aggregator estimates, were published.
Evidence: NVIDIA Blackwell datasheet (individual GPU specifications, GB200 NVL72 column) · NVIDIA GB200 NVL72 specifications · Full record
Permalink for Correction: GB200 NVL72 was priced per PFLOP-hour at the HGX B200's dense rate
Correction Correction: The GeForce RTX 4090 was listed as shipping after it left productionHardware specs
Was: The spec table listed the GeForce RTX 4090 as shipping. Corrected to: Legacy: press reports relaying supply-chain sources said the card went out of production in late 2024, and the RTX 5090 succeeded it in January 2025. NVIDIA has published no end-of-life notice. Where: /hardware spec table; /accelerators.json and /accelerators.csv. Found by a scheduled survey.
Evidence: Digital Trends via Yahoo Tech: RTX 40-series cards going out of production · Full record
Permalink for Correction: The GeForce RTX 4090 was listed as shipping after it left production
Correction Correction: Vera Rubin's first production shipments were dated a month lateHardware specs
Was: The spec table dated Vera Rubin's launch, its first production shipments, to September 2026, an estimate made before NVIDIA reported them. Corrected to: August 2026: NVIDIA's investor presentation for its second fiscal 2027 quarter, published Aug 26, 2026, said it commenced production shipments of Vera Rubin in early August. Where: /hardware spec table; llms-full.txt accelerator specs; /accelerators.json and /accelerators.csv. Found by a scheduled survey.
Evidence: NVIDIA Q2 fiscal 2027 investor presentation · Full record
Permalink for Correction: Vera Rubin's first production shipments were dated a month late